TEXAS · WELLS · JOHNSON COUNTY · GRIZZLY KING LEASE · API 42-251-30276 · DISTRICT 7C

Grizzly King #1

Shut in

Johnson County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Grizzly King #1 (API 42-251-30276) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed April 1, 2005 and listed as temp abandoned on the RRC schedule, shut in February 1, 2012.

The RRC has issued one drilling permit, issued November 8, 2004, permitted to 6,570 ft.

It was permitted by Arrington,David H. Oil & Gas,Inc and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Base Of Cretaeous, Atoka, Marble Falls, Barnett.

Its lease has reported 571K mcf of gas since April 2005, with no volume in the three years through April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Arrington,david H. Oil & Gas,inc; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Jan 2012
Latest permitArrington,david H. Oil & Gas,incNov 8, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,570
total depth, ft
1
permits on file
Nov 8, 2004
last permit issued
Apr 1, 2005
completed
0
cumulative oil, bbl
571K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Jan 2012

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 1, 2005
Shut in
Feb 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Grizzly King G-13-208338Newark, East (Barnett Shale)TEP Barnett USA, LLC10571KApr 2005 – Jan 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrington,david H. Oil & Gas,incApr 2005 → Dec 2005
  2. 2Chesapeake Operating, Inc.Jan 2006 → Jan 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
553309-99DrillArrington,david H. Oil & Gas,incNov 8, 2004Nov 8, 2004Jan 3, 20056,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 2005Grizzly King G-13-208338Newark East (Barnett Shale)TEP Barnett USA LLCTemp Abandoned · shut in Feb 1, 20126,570

Formation tops

As filed on W-2/G-1. Subsea from 943 ft elevation.Download CSV →

FormationMD ftSubsea
Base of Cretaeous1,045-102
Atoka4,490-3,547
Marble Falls5,991-5,048
BarnettBARNETT SHALE6,439-5,496
Ellenburger6,760-5,817

Perforations

Perforated and open-hole intervals.

FromToType
7,7009,870Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,20012.25545 S
76,1948.75590 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 22, 2007Apr 18, 2005Yes
00May 23, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25130276, documented in the API reference.