TEXAS · WELLS · JOHNSON COUNTY · SILVER DOWN EASTER LEASE · API 42-251-30392 · DISTRICT 7C

Silver Down Easter #1H

Shut in

Johnson County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Silver Down Easter #1H (API 42-251-30392) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed November 10, 2005 and listed as temp abandoned on the RRC schedule, shut in July 1, 2015.

The RRC has issued one drilling permit, issued May 2, 2005, permitted to 7,195 ft.

It was permitted by Arrington,David H. Oil & Gas,Inc and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report one formation top, including Barnett.

Its lease has reported 1.45M mcf of gas since November 2005, with no volume in the three years through April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Arrington,david H. Oil & Gas,inc; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Jun 2015
Latest permitArrington,david H. Oil & Gas,incMay 2, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,195
total depth, ft
1
permits on file
May 2, 2005
last permit issued
Nov 10, 2005
completed
0
cumulative oil, bbl
1.45M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Jun 2015

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 10, 2005
Shut in
Jul 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Silver Down Easter G-13-223925Newark, East (Barnett Shale)TEP Barnett USA, LLC101.45MNov 2005 – Jun 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrington,david H. Oil & Gas,incNov 2005 → Dec 2005
  2. 2Chesapeake Operating, Inc.Jan 2006 → Oct 2014
  3. 3Chesapeake Operating, L.L.C.Nov 2014 → Jun 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
600085-99DrillArrington,david H. Oil & Gas,incMay 2, 2005May 2, 2005May 24, 20057,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 10, 2005Silver Down Easter G-13-223925Newark East (Barnett Shale)TEP Barnett USA LLCTemp Abandoned · shut in Jul 1, 20157,195

Formation tops

As filed on W-2/G-1. Subsea from 664 ft elevation.Download CSV →

FormationMD ftSubsea
BarnettBARNETT SHALE7,020-6,356

Perforations

Perforated and open-hole intervals.

FromToType
8,8809,246Perforated
9,5009,911Perforated
10,05010,370Perforated
10,51410,845Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,75212.25670 S
78,1838.75550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 14, 2007Dec 12, 2005Yes
00Jan 24, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25130392, documented in the API reference.