WELL · 42-251-30629 · DISTRICT 9
Russell #2H
Johnson County · Newark East (Barnett Shale) field · Horizontal
Russell #2H (API 42-251-30629) is a plugged horizontal well in Johnson County, plugged April 12, 2007, last operated by Williams Prod. Gulf Coast L.P..
The RRC has issued one drilling permit (amended once), issued November 10, 2005, permitted to 8,100 ft.
Completion filings report 3 formation tops, including Marble Falls, U. Barnett Shale, L. Barnett Shale.
Operator of record
Williams Prod. Gulf Coast L.P.
- Based in
- Benbrook, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jul 11, 2011
- Permits on file
- 475
- Phone
- (817) 560-5036
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams Prod. Gulf Coast L.P. |
| Production reports | Williams Prod. Gulf Coast, L.P.through Feb 2007 |
| Latest permit | Williams Prod. Gulf Coast, L.P.Nov 10, 2005 |
- 8,100
- total depth, ft
- 2
- permits on file
- Nov 10, 2005
- last permit issued
- Apr 13, 2006
- completed
- 0
- cumulative oil, bbl
- 111K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2006 THROUGH Apr 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 13, 2006
- Shut in
- —
- Plugged
- Apr 12, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Russell G-13-233384 | Newark, East (Barnett Shale) | Williams Prod. Gulf Coast, L.P. | 1 | 0 | 111K | Apr 2006 – Apr 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Williams Prod. Gulf Coast, L.P.May 2006 → Feb 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 609312-98 | Drill | Williams Prod. Gulf Coast, L.P. | Jun 22, 2007 | Nov 10, 2005 | Mar 1, 2006 | 8,100 |
| 609312-99 | Drill | Williams Prod. Gulf Coast, L.P. | Nov 9, 2005 | Nov 10, 2005 | Mar 1, 2006 | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-233384 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 778 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble FallsMARBLE FALLS LIME | 7,000 | -6,222 |
| U. Barnett Shale | 7,271 | -6,493 |
| L. Barnett Shale | 7,666 | -6,888 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,295 | 8,750 | Perforated |
| 8,970 | 9,425 | Perforated |
| 9,645 | 10,100 | Perforated |
| 10,320 | 10,775 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,840 | 12.25 | 730 S |
| 5.5 | 10,836 | 7.875 | 780 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 2008 | Oct 3, 2007 | Yes |
| 00 | Mar 3, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-251-30629 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-251-30629 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25130629, documented in the API reference.