TEXAS · WELLS · JOHNSON COUNTY · EBERHART, JUANITA LEASE · API 42-251-31023 · DISTRICT 7C
Eberhart Juanita #1
Johnson County · Newark East (Barnett Shale) field · Horizontal
Eberhart Juanita #1 (API 42-251-31023) is a plugged horizontal well in Johnson County, plugged February 24, 2025, last operated by Javelin Energy Partners Mgmt LLC.
The RRC has issued one drilling permit (amended twice), issued June 9, 2006, permitted to 9,000 ft.
It was permitted by Devon Energy Production CO, L.P. and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Big Saline, Marble Falls, Barnett.
Its lease has reported 741K mcf of gas since September 2006, with no volume in the three years through April 2026.
Operator of record
Javelin Energy Partners Mgmt LLC
Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 24, 2026
- Permits on file
- 234
- Phone
- (469) 575-3800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Javelin Energy Partners Mgmt LLC |
| Production reports | Javelin Energy Partners Mgmt LLCthrough Sep 2021 |
| Latest permit | Devon Energy Production Co, L.P.Jun 9, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 3
- permits on file
- Jun 9, 2006
- last permit issued
- Sep 20, 2006
- completed
- 0
- cumulative oil, bbl
- 741K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Sep 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 2006
- Shut in
- —
- Plugged
- Feb 24, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eberhart, Juanita G-13-226619 | Newark, East (Barnett Shale) | Javelin Energy Partners Mgmt LLC | 1 | 0 | 741K | Sep 2006 – Sep 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Devon Energy Production Co, L.P.Sep 2006 → Apr 2018
- 2FDL Operating, LLCMay 2018 → Sep 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 620545-97 | Drill | Devon Energy Production Co, L.P. | Oct 2, 2013 | Jun 9, 2006 | Jul 12, 2006 | 9,000 |
| 620545-98 | Drill | Devon Energy Production Co, L.P. | Jun 22, 2006 | Jun 9, 2006 | Jul 12, 2006 | 9,000 |
| 620545-99 | Drill | Devon Energy Production Co, L.P. | Jun 6, 2006 | Jun 9, 2006 | Jul 13, 2006 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 20, 2006 | Eberhart Juanita G-13-226619 | Newark East (Barnett Shale) | Javelin Energy Partners Mgmt LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 785 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Big Saline | 6,980 | -6,195 |
| Marble Falls | 7,454 | -6,669 |
| BarnettBARNETT SHALE | 7,740 | -6,955 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,895 | 8,219 | Perforated |
| 8,323 | 8,747 | Perforated |
| 8,751 | 9,075 | Perforated |
| 9,179 | 9,503 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,626 | 12.25 | 560 S |
| 5.5 | 9,580 | 8.5 | 1,480 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 18, 2007 | Nov 2, 2006 | Yes |
| 00 | May 16, 2007 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received Sep 8, 2009. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITY | TIFF | 1,625 to 6,776 | Sep 8, 2009run Jul 19, 2006 | 3.05 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-251-31023 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-251-31023 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25131023, documented in the API reference.