WELL · 42-251-31254 · DISTRICT 9
Hutchens #1H
Johnson County · Newark East (Barnett Shale) field · Horizontal
Hutchens #1H (API 42-251-31254) is a plugged horizontal well in Johnson County, plugged July 30, 2015, last operated by Xto Energy Inc..
The RRC has issued one drilling permit, issued October 11, 2006, permitted to 10,500 ft.
It was permitted by Joint Resources Company and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Bend, Mississippian, Barnett.
Operator of record
Permitted by Joint Resources Company; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Mar 2015 |
| Latest permit | Joint Resources CompanyOct 11, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 1
- permits on file
- Oct 11, 2006
- last permit issued
- May 11, 2007
- completed
- 0
- cumulative oil, bbl
- 462K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jul 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 11, 2007
- Shut in
- —
- Plugged
- Jul 30, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hutchens G-13-249203 | Newark, East (Barnett Shale) | XTO Energy Inc. | 1 | 0 | 462K | May 2007 – Jul 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Joint Resources CompanyMay 2007 → Jun 2007
- 2XTO Energy Inc.Jul 2007 → Mar 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 627289-99 | Drill | Joint Resources Company | Oct 10, 2006 | Oct 11, 2006 | Nov 2, 2006 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-249203 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 948 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BendBEND CONGLOMERATE | 5,660 | -4,712 |
| Mississippian | 6,980 | -6,032 |
| BarnettBARNETT SHALE | 7,165 | -6,217 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,040 | 8,460 | Perforated |
| 8,712 | 9,132 | Perforated |
| 10,258 | 10,902 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,130 | 12.25 | 425 S |
| 5.5 | 11,039 | 8.75 | 1,225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 2009 | Jul 30, 2007 | Yes |
| 00 | Jul 13, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-251-31254 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-251-31254 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25131254, documented in the API reference.