TEXAS · WELLS · JOHNSON COUNTY · TOLBERT LEASE · API 42-251-32456 · DISTRICT 7C

Tolbert #5H

Y

Johnson County · Newark East (Barnett Shale) field · Producing  · Horizontal

Tolbert #5H (API 42-251-32456) is a horizontal well in Johnson County operated by Upp Operating LLC, completed June 22, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 18, 2007, permitted to 8,317 ft.

It was permitted by Eog Resources, Inc. and has since transferred to Upp Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Strawn, Atoka, Bend, Marble Falls.

Its lease has reported 1.28M mcf of gas since August 2009, last reporting volume in March 2026.

Operator of record

Upp Operating LLC

Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 6, 2026
Permits on file
33
Phone
(713) 495-5300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUpp Operating LLC
Production reportsUpp Operating, LLCthrough Mar 2026
Latest permitEOG Resources, Inc.Dec 22, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,317
total depth, ft
2
permits on file
Dec 22, 2008
last permit issued
Jun 22, 2010
completed
0
cumulative oil, bbl
1.28M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 22, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tolbert G-13-254807Newark, East (Barnett Shale)Upp Operating, LLC101.28MAug 2009 – Mar 2026

Gas, mcf lease total

Last 12 months 6,757 · prior 12 26,381(-74%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Jul 2010 → Dec 2016
  2. 2Enervest Operating, L.L.C.Jan 2017 → Mar 2019
  3. 3Upp Operating, LLCApr 2019 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
651355-98DrillEOG Resources, Inc.Dec 10, 2008Dec 22, 2008Jul 31, 200910,000
651355-99DrillEOG Resources, Inc.Dec 13, 2007Dec 18, 2007—10,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 22, 2010Tolbert G-13-254807Newark East (Barnett Shale)Upp Operating LLCProducing8,317

Formation tops

As filed on W-2/G-1. Subsea from 602 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,006-1,404
Atoka4,130-3,528
BendBEND CONGL.5,756-5,154
BendBEND. CONGL5,756-5,154
Marble Falls7,844-7,242
BarnettBARNETT SHALE8,129-7,527

Perforations

Perforated and open-hole intervals.

FromToType
8,66111,809Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,92612.25710 S
5.511,9188.751,023 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 14, 2011Oct 19, 2010—
00Apr 9, 2010Feb 24, 2010Yes
00Mar 2, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25132456, documented in the API reference.