WELL · 42-251-33416 · DISTRICT 9

King B #1H

Y

Johnson County · Newark East (Barnett Shale) field · Producing  · Horizontal

King B #1H (API 42-251-33416) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed March 1, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended 3 times), issued November 7, 2008, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Nov 7, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
4
permits on file
Nov 7, 2008
last permit issued
Mar 1, 2011
completed
0
cumulative oil, bbl
6.61M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King B G-13-257546Newark, East (Barnett Shale)TEP Barnett USA, LLC106.61MMay 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 173,849 · prior 12 186,562(-7%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
  3. 3TEP Barnett USA, LLCAug 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
674203-96DrillChesapeake Operating, Inc.Apr 30, 2010Nov 7, 2008May 14, 20109,000
674203-97DrillChesapeake Operating, Inc.Nov 2, 2009Nov 7, 2008—9,000
674203-98DrillChesapeake Operating, Inc.Oct 30, 2009Nov 7, 2008—9,000
674203-99DrillChesapeake Operating, Inc.Oct 31, 2008Nov 7, 2008—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-257546————

Formation tops

As filed on W-2/G-1. Subsea from 713 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME6,574-5,861
BarnettUPPER BARNETT7,114-6,401
BarnettLOWER BARNETT7,150-6,437

Perforations

Perforated and open-hole intervals.

FromToType
7,51613,606Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,35212.25375 S
5.513,6978.751,545 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 7, 2011Mar 31, 2011—
00Sep 30, 2010Aug 12, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25133416, documented in the API reference.