TEXAS · WELLS · JOHNSON COUNTY · WINNETT UNIT LEASE · API 42-251-33504 · DISTRICT 7C

Winnett Unit #3H

Shut in

Johnson County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Winnett Unit #3H (API 42-251-33504) is a horizontal well in Johnson County operated by Bkv North Texas LLC, completed December 10, 2009 and listed as temp abandoned on the RRC schedule, shut in July 1, 2024.

The RRC has issued one drilling permit (amended once), issued January 7, 2009, permitted to 6,462 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Atoka, Marble Falls, Barnett.

Its lease has reported 128 barrels of oil and 853K mcf of gas since December 2009, last reporting volume in June 2024.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Jun 2024
Latest permitXTO Energy Inc.Jan 7, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,462
total depth, ft
2
permits on file
Jan 7, 2009
last permit issued
Dec 10, 2009
completed
128
cumulative oil, bbl
853K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2009 THROUGH Jun 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 10, 2009
Shut in
Jul 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Winnett Unit G-13-254323Newark, East (Barnett Shale)BKV North Texas, LLC1128853KDec 2009 – Jun 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 2(-100%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Dec 2009 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
676853-98DrillXTO Energy Inc.Jan 5, 2010Jan 7, 2009Oct 17, 200911,000
676853-99DrillXTO Energy Inc.Dec 30, 2008Jan 7, 2009Oct 17, 200911,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 10, 2009Winnett Unit G-13-254323Newark East (Barnett Shale)BKV North Texas LLCTemp Abandoned · shut in Jul 1, 20246,462

Formation tops

As filed on W-2/G-1. Subsea from 816 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaBASE ATOKA5,450-4,634
Marble Falls5,936-5,120
BarnettUPPER BARNETT6,321-5,505

Perforations

Perforated and open-hole intervals.

FromToType
6,9758,508Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,26612.25420 S
5.58,5408.75775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 1, 2010Jan 12, 2010Yes
00Feb 2, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25133504, documented in the API reference.