WELL · 42-251-33952 · DISTRICT 9
Ralph #1H
Johnson County · Newark East (Barnett Shale) field · Producing · Horizontal
Ralph #1H (API 42-251-33952) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed January 2, 2011 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued March 25, 2010, permitted to 9,000 ft.
It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Atoka, Barnett.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 10, 2026
- Permits on file
- 371
- Phone
- (817) 720-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TEP Barnett USA LLC |
| Production reports | TEP Barnett USA, LLCthrough Mar 2025 |
| Latest permit | Chesapeake Operating, Inc.Mar 25, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 3
- permits on file
- Mar 25, 2010
- last permit issued
- Jan 2, 2011
- completed
- 0
- cumulative oil, bbl
- 1.94M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 2, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ralph G-13-257517 | Newark, East (Barnett Shale) | TEP Barnett USA, LLC | 1 | 0 | 1.94M | May 2010 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 11,169(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Jan 2011 → Oct 2014
- 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
- 3TEP Barnett USA, LLCAug 2017 → Mar 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 693382-97 | Drill | Chesapeake Operating, Inc. | May 5, 2010 | Mar 25, 2010 | — | 9,000 |
| 693382-98 | Drill | Chesapeake Operating, Inc. | Mar 29, 2010 | Mar 25, 2010 | May 7, 2010 | 9,000 |
| 693382-99 | Drill | Chesapeake Operating, Inc. | Mar 24, 2010 | Mar 25, 2010 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-257517 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 764 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,575 | 9,402 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,437 | 12.25 | 405 S |
| 5.5 | 10,597 | 8.75 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 25, 2011 | Mar 4, 2011 | — |
| 00 | Sep 28, 2010 | Aug 10, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-251-33952 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-251-33952 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25133952, documented in the API reference.