TEXAS · WELLS · JOHNSON COUNTY · CORDELIA-HUSKEY (SA) LEASE · API 42-251-34247 · DISTRICT 7C

Cordelia-Huskey (SA) #1H

Y

Johnson County · Newark East (Barnett Shale) field · Producing  · Horizontal

Cordelia-Huskey (SA) #1H (API 42-251-34247) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed March 23, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 2, 2011, permitted to 7,300 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

Its lease has reported 2.05M mcf of gas since October 2011, last reporting volume in April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.May 2, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,300
total depth, ft
1
permits on file
May 2, 2011
last permit issued
Mar 23, 2012
completed
0
cumulative oil, bbl
2.05M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2012 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 23, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cordelia-Huskey (SA) G-13-262978Newark, East (Barnett Shale)TEP Barnett USA, LLC102.05MOct 2011 – Apr 2026

Gas, mcf lease total

Last 12 months 77,590 · prior 12 111,443(-30%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2012 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
  3. 3TEP Barnett USA, LLCAug 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
711881-99DrillChesapeake Operating, Inc.Mar 9, 2011May 2, 2011Sep 29, 20119,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 23, 2012Cordelia-Huskey (SA) G-13-262978Newark East (Barnett Shale)TEP Barnett USA LLCProducing7,300

Formation tops

As filed on W-2/G-1. Subsea from 929 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME6,591-5,662
BarnettUPPER BARNETT7,111-6,182
BarnettLOWER BARNETT7,146-6,217

Perforations

Perforated and open-hole intervals.

FromToType
7,7608,516Perforated
8,6259,381Perforated
9,49010,246Perforated
10,35511,111Perforated
11,22011,976Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,44212.25410 S
5.512,0748.751,270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 18, 2012May 8, 2012—
00Apr 11, 2012Oct 31, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25134247, documented in the API reference.