TEXAS · WELLS · JOHNSON COUNTY · RANDOLPH LEASE · API 42-251-34267 · DISTRICT 7C

Randolph #3H

Shut in

Johnson County · Newark East (Barnett Shale) field · Producing  · Horizontal

Randolph #3H (API 42-251-34267) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed August 24, 2011 and listed as producing on the RRC schedule, shut in August 1, 2019.

The RRC has issued one drilling permit, issued April 12, 2011, permitted to 7,423 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

Its lease has reported 1.21M mcf of gas since June 2011, with no volume in the three years through April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Jul 2019
Latest permitChesapeake Operating, Inc.Apr 12, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,423
total depth, ft
1
permits on file
Apr 12, 2011
last permit issued
Aug 24, 2011
completed
0
cumulative oil, bbl
1.21M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2019

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 24, 2011
Shut in
Aug 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Randolph G-13-261649Newark, East (Barnett Shale)TEP Barnett USA, LLC101.21MJun 2011 – Jul 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Aug 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
  3. 3TEP Barnett USA, LLCAug 2017 → Jul 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
713770-99DrillChesapeake Operating, Inc.Apr 7, 2011Apr 12, 2011May 17, 20119,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 24, 2011Randolph G-13-261649Newark East (Barnett Shale)TEP Barnett USA LLCProducing · shut in Aug 1, 20197,423

Formation tops

As filed on W-2/G-1. Subsea from 849 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME6,792-5,943
BarnettUPPER BARNETT7,355-6,506
BarnettLOWER BARNETT7,495-6,646

Perforations

Perforated and open-hole intervals.

FromToType
7,76011,150Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,51312.25430 S
5.511,2488.751,135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 27, 2012Sep 13, 2011—
00Dec 27, 2011Jul 1, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25134267, documented in the API reference.