WELL · 42-251-34294 · DISTRICT 9

Hatcher Unit #9H

Shut in

Johnson County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Hatcher Unit #9H (API 42-251-34294) is a horizontal well in Johnson County operated by Bkv North Texas LLC, completed July 16, 2012 and listed as temp abandoned on the RRC schedule, shut in August 1, 2023.

The RRC has issued one drilling permit (amended once), issued May 2, 2011, permitted to 7,204 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Smithwick, Marble Falls, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
22
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Jul 2023
Latest permitXTO Energy Inc.May 2, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,204
total depth, ft
2
permits on file
May 2, 2011
last permit issued
Jul 16, 2012
completed
0
cumulative oil, bbl
1.35M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 16, 2012
Shut in
Aug 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hatcher Unit G-13-263103Newark, East (Barnett Shale)BKV North Texas, LLC101.35MSep 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jul 2012 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Jul 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
715016-98DrillXTO Energy Inc.Nov 15, 2011May 2, 2011Aug 30, 201112,000
715016-99DrillXTO Energy Inc.Apr 26, 2011May 2, 2011Aug 30, 201112,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 16, 2012Hatcher Unit G-13-263103Newark East (Barnett Shale)BKV North Texas LLCTemp Abandoned · shut in Aug 1, 20237,204

Formation tops

As filed on W-2/G-1. Subsea from 868 ft elevation.Download CSV →

FormationMD ftSubsea
Smithwick6,483-5,615
Marble Falls6,923-6,055
Barnett7,090-6,222

Perforations

Perforated and open-hole intervals.

FromToType
7,7498,005Perforated
8,1058,361Perforated
8,4618,717Perforated
8,8179,073Perforated
9,1739,429Perforated
9,5299,785Perforated
9,88510,141Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,85212.25605 S
5.510,1948.751,155 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2013Aug 14, 2012—
00Apr 23, 2012Nov 21, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25134294, documented in the API reference.