TEXAS · WELLS · JOHNSON COUNTY · RICE UNIT LEASE · API 42-251-34312 · DISTRICT 7C

Rice Unit #4H

Shut in

Johnson County · Newark East (Barnett Shale) field · Producing  · Horizontal

Rice Unit #4H (API 42-251-34312) is a horizontal well in Johnson County operated by Bkv North Texas LLC, completed February 17, 2012 and listed as producing on the RRC schedule, shut in March 1, 2026.

The RRC has issued one drilling permit, issued August 10, 2011, permitted to 7,570 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Barnett, Smithwick, Marble Falls.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Feb 2026
Latest permitXTO Energy Inc.Aug 10, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,570
total depth, ft
1
permits on file
Aug 10, 2011
last permit issued
Feb 17, 2012
completed
0
cumulative oil, bbl
2.76M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 17, 2012
Shut in
Mar 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rice Unit G-13-263469Newark, East (Barnett Shale)BKV North Texas, LLC102.76MSep 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 55,473 · prior 12 75,308(-26%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Feb 2012 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
716088-99DrillXTO Energy Inc.May 10, 2011Aug 10, 2011Sep 18, 201112,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 17, 2012Rice Unit G-13-263469Newark East (Barnett Shale)BKV North Texas LLCProducing · shut in Mar 1, 20267,570

Formation tops

As filed on W-2/G-1. Subsea from 769 ft elevation.Download CSV →

FormationMD ftSubsea
Barnett75019
Smithwick6,920-6,151
Marble Falls7,372-6,603
Barnett7,500-6,731

Perforations

Perforated and open-hole intervals.

FromToType
8,0118,292Perforated
8,3928,672Perforated
8,7739,053Perforated
9,1549,435Perforated
9,5359,816Perforated
9,91610,197Perforated
10,27910,578Perforated
10,67810,959Perforated
11,05912,020Perforated
11,20911,515Perforated
11,82112,102Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,76412.25575 S
5.512,1558.751,495 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 2012Mar 20, 2012—
00May 18, 2012Jan 18, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25134312, documented in the API reference.