WELL · 42-253-00499 · DISTRICT 7
Hunter, AB "A" #1
Jones County · Vertical
Hunter, AB "A" #1 (API 42-253-00499) is a plugged well in Jones County, plugged April 6, 1989, last operated by D. A. B. Oil Service, Inc..
The RRC has issued 3 drilling permits between 1983 and 1989, permitted to 5,400 ft.
Completion filings report 2 formation tops, including Canyon, Palo Pinto.
Operator of record
Abilene, TX · P-5 Y, filed Dec 6, 2013 · 114 permits on file · (325) 721-0962
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | D. A. B. Oil Service, Inc.Sep 22, 1989 |
- 5,400
- total depth, ft
- 3
- permits on file
- Sep 22, 1989
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 6, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hunter, AB "A" O-8-26631 | Jones County Regular | Oklahoma EA II, L.L.C. | 1 | 0 | 0 | Jan 1993 – Jan 2004 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 364114-99 | Reenter | D. A. B. Oil Service, Inc. | Sep 19, 1989 | Sep 22, 1989 | Oct 25, 1989 | 4,200 |
| 354423-99 | Reenter | D. A. B. Oil Service, Inc. | Dec 19, 1988 | Mar 15, 1989 | — | 5,400 |
| 219844-99 | Other | Gillespie Drilling Company | Aug 31, 1983 | Nov 3, 1983 | — | 4,063 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26631 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,721 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 3,910 | -2,189 |
| Palo Pinto | 3,938 | -2,217 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,040 | 4,046 | Perforated |
| 4,040 | 4,170 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 122 | 12.25 | 75 S |
| 4.5 | 4,246 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 11, 1993 | Jun 21, 1993 | — |
| 00 | Oct 9, 1992 | Aug 18, 1992 | Yes |
| 00 | Sep 3, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-00499 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-00499 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 126K
- bbl, all reported
- Oct 2003
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000078479 | H-1 Injection | Plugged Jan 8, 2004 | 600 | 2,000 | 4,040–4,170 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 8,981(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25300499, documented in the API reference.