WELL · 42-253-31465 · DISTRICT 7
Harp Melvin #4R
Jones County · Jones County Regular field · Vertical
Harp Melvin #4R (API 42-253-31465) is a plugged well in Jones County, plugged April 8, 2010, last operated by Mma Operating CO..
The RRC has issued one drilling permit, issued April 22, 1980, permitted to 1,800 ft.
It was permitted by Cola Petroleum, Inc. and has since transferred to Mma Operating CO. on the wellbore schedule.
Its 2 leases have reported 4.67K barrels of oil and 5 mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cola Petroleum, Inc.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 2000
- Phone
- (325) 762-3343
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mma Operating Co. |
| Production reports | Intergrated Petroleum Corp.through Feb 2001 |
| Latest permit | Cola Petroleum, Inc.Apr 22, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,800
- total depth, ft
- 1
- permits on file
- Apr 22, 1980
- last permit issued
- May 3, 1980
- completed
- 4.67K
- cumulative oil, bbl
- 5
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 3, 1980
- Shut in
- —
- Plugged
- Apr 8, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harp, Melvin O-8-15797 | Jones County Regular | Intergrated Petroleum Corp. | 9 | 3.95K | 5 | Jan 1993 – Jul 2026 |
| Harp, Melvin O-8-28638 | Jones County Regular | Mma Operating Co. | 1 | 720 | 0 | Sep 1999 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cuatro Oil and Gas CorporationFeb 1993 → Mar 1993
- 2Intergrated Petroleum Corp.Apr 1993 → Feb 2001
- 3Mma Operating Co.Sep 1999 → Feb 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 78841-99 | Drill | Cola Petroleum, Inc. | Apr 22, 1980 | Apr 22, 1980 | Apr 18, 1980 | 1,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-15797 | — | — | — | — |
| — | — O-8-28638 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,726 | 1,740 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 134 | 11 | 80 S |
| 2.375 | 1,726 | — | — |
| 4.5 | 1,790 | 7.875 | 75 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 16, 1999 | May 15, 1980 | — |
| 00 | Jan 12, 1984 | May 15, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-31465 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-31465 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25331465, documented in the API reference.