WELL · 42-253-31884 · DISTRICT 7
Windham #2
Jones County · Noodle W. (Palo Pinto) field · Vertical
Windham #2 (API 42-253-31884) is a plugged well in Jones County, plugged June 11, 1990, last operated by Fisher Jack Inc..
The RRC has issued 2 drilling permits between 1981 and 1989, permitted to 5,400 ft.
Completion filings report 6 formation tops, including B/Coleman Junction, Canyon, Palo Pinto, B/Capps.
Operator of record
Abilene, TX · P-5 Y, filed Sep 14, 2001 · 82 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fisher Jack Inc. |
| Production reports | none |
| Latest permit | Fisher, Jack Inc.Jun 12, 1989 |
- 5,400
- total depth, ft
- 2
- permits on file
- Jun 12, 1989
- last permit issued
- Aug 30, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 30, 1989
- Shut in
- —
- Plugged
- Jun 11, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-8-25559 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 360246-99 | Recompletion | Fisher, Jack Inc. | Jun 9, 1989 | Jun 12, 1989 | — | 4,600 |
| 121375-99 | Drill | Fisher-Webb, Inc. | Jun 11, 1981 | Jun 11, 1981 | — | 5,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-25559 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,909 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 2,166 | -257 |
| CanyonCANYON SAND | 4,074 | -2,165 |
| Palo Pinto | 4,430 | -2,521 |
| B/Capps | 4,852 | -2,943 |
| B/Caddo | 5,352 | -3,443 |
| Ellenburger | 5,372 | -3,463 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,434 | 4,457 | Perforated |
| — | 5,420 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 135 | 11.25 | 85 S |
| 2.375 | 5,382 | — | — |
| 4.5 | 5,390 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 7, 1989 | Sep 28, 1989 | Yes |
| 00 | Oct 19, 1989 | — | — |
| 00 | Jun 7, 1989 | — | — |
| 00 | Jan 12, 1984 | Aug 3, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-31884 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-31884 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25331884, documented in the API reference.