WELL · 42-253-31990 · DISTRICT 8

Blankenship, Leon #1WI

Plugged

Jones County  · Vertical

Blankenship, Leon #1WI (API 42-253-31990) is a plugged well in Jones County, plugged April 25, 2007, last operated by L.C.S. Production Company.

The RRC has issued 2 drilling permits between 1981 and 2005, permitted to 3,999 ft.

Operator of record

L.C.S. Production Company

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 14, 2026
Permits on file
1,707
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitL.C.S. Production CompanyJul 5, 2005
3,999
total depth, ft
2
permits on file
Jul 5, 2005
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 25, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
602897-99ReenterL.C.S. Production CompanyJun 30, 2005Jul 5, 2005Apr 19, 20073,999
130567-99DrillSandia Resources CorporationAug 20, 1981Aug 20, 1981—3,225

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094472H-1 InjectionCanceled Sep 17, 20154001,5203,100–3,180

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25331990, documented in the API reference.