TEXAS · WELLS · JONES COUNTY · API 42-253-32213 · DISTRICT 6E

Williams Irene #3

Plugged

Jones County · Jay (Noodle Creek) field  · Vertical

Williams Irene #3 (API 42-253-32213) is a plugged well in Jones County, plugged August 12, 2025, last operated by Sojourner Drilling Corporation.

The RRC has issued 2 drilling permits between 1982 and 1996, permitted to 4,600 ft.

Completion filings report 3 formation tops, including T/Coleman Jc. Lm., T/Noodle Cr., T/Canyon.

Its 2 leases have reported 383K barrels of oil and 1.03M mcf of gas since January 1993, last reporting in July 2026. The leases carry 13 wells, so these are lease totals, not this well alone.

Operator of record

Sojourner Drilling Corporation

Based in
Abilene, TX
P-5 status
Active (A)
P-5 last filed
Oct 7, 2025
Permits on file
872
Phone
(325) 672-2832

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drlg. Corp.Aug 9, 1996
4,600
total depth, ft
2
permits on file
Aug 9, 1996
last permit issued
Jul 9, 1996
completed
383K
cumulative oil, bbl
1.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 9, 1996
Shut in
—
Plugged
Aug 12, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jay (Canyon Lime) Unit O-8-23260Jay (Canyon Lime)Sojourner Drilling Corporation10365K1.03MJan 1993 – Jul 2026
Williams, Irene O-8-16336Jay (Noodle Creek)Sojourner Drilling Corporation318.1K460Jan 1993 – Sep 2025

Oil, barrels lease total

Last 12 months 18,382 · prior 12 21,022(-13%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 64,004 · prior 12 51,566(+24%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationJan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
450911-99RecompletionSojourner Drlg. Corp.Jul 29, 1996Aug 9, 1996Jul 2, 19962,640
160181-99DrillSojourner Drlg. Corp.May 5, 1982May 5, 1982Jun 16, 19824,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 9, 1996Williams Irene O-8-16336Jay (Noodle Creek)Sojourner Drilling CorporationPlugged—
Jun 25, 1986Jay (Canyon Lime) Unit O-8-23260Jay (Canyon Lime)Sojourner Drilling CorporationPlugged—
Jul 1, 1982Williams Irene O-8-18790Jay (Canyon Lime)Sojourner Drilling CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,903 ft elevation.Download CSV →

FormationMD ftSubsea
T/Coleman Jc. Lm.2,218-315
T/Noodle Cr.2,540-637
T/Canyon4,173-2,270

Perforations

Perforated and open-hole intervals.

FromToType
2,5602,568Perforated
4,2344,253Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516112.25160 S
2.3754,240——
5.54,4057.875590 S
8.625—12.25160 S
8.625——160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 9, 1996Jul 26, 1996—
00Aug 29, 1996Nov 21, 1986Yes
00Dec 15, 1986Nov 21, 1986—
00Jan 22, 1986Jul 12, 1982—
00Jan 8, 1986——
00Jan 12, 1984Jul 12, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25332213, documented in the API reference.