TEXAS · WELLS · JONES COUNTY · API 42-253-32296 · DISTRICT 6E
Sojourner A #3
Jones County · Four Way (Flippen Lime) field · Vertical
Sojourner A #3 (API 42-253-32296) is a plugged well in Jones County, plugged April 13, 1988, last operated by Sojourner Drilling Corporation.
The RRC has issued one drilling permit, issued August 19, 1982, permitted to 4,350 ft.
Operator of record
Sojourner Drilling Corporation
- Based in
- Abilene, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 7, 2025
- Permits on file
- 872
- Phone
- (325) 672-2832
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sojourner Drilling Corporation |
| Production reports | none |
| Latest permit | Sojourner Drlg. Corp.Aug 19, 1982 |
- 4,350
- total depth, ft
- 1
- permits on file
- Aug 19, 1982
- last permit issued
- Sep 6, 1982
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 6, 1982
- Shut in
- —
- Plugged
- Apr 13, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 169718-99 | Drill | Sojourner Drlg. Corp. | Aug 19, 1982 | Aug 19, 1982 | Aug 19, 1982 | 4,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 6, 1982 | Sojourner A O-8-18935 | Four Way (Flippen Lime) | Sojourner Drilling Corporation | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,069 | 3,074 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 161 | 12.25 | 160 S |
| 2.375 | 3,087 | — | — |
| 4.5 | 3,261 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 14, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-32296 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-32296 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25332296, documented in the API reference.