WELL · 42-253-32448 · DISTRICT 7

Dillard #1

Plugged

Jones County · Jones County Regular field  · Vertical

Dillard #1 (API 42-253-32448) is a plugged well in Jones County, plugged November 26, 1985, last operated by Tex-Ace Operating Company.

The RRC has issued one drilling permit, issued March 2, 1983, permitted to 5,000 ft.

Completion filings report 2 formation tops, including Flippen, Canyon.

Operator of record

Tex-Ace Operating Company

Aledo, TX · P-5 Y, filed Oct 27, 1992 · 15 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTex-Ace Operating Company
Production reportsnone
Latest permitTex-Ace Operating CompanyMar 2, 1983
5,000
total depth, ft
1
permits on file
Mar 2, 1983
last permit issued
Feb 12, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 12, 1983
Shut in
—
Plugged
Nov 26, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
187264-99DrillTex-Ace Operating CompanyOct 18, 1984Mar 2, 1983Feb 19, 19835,000

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Flippen3,080
Canyon4,548

Perforations

Perforated and open-hole intervals.

FromToType
4,5484,648Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520011130 S
4.54,8777.875130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 17, 1985Oct 16, 1984—
00Jan 11, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25332448, documented in the API reference.