WELL · 42-253-33005 · DISTRICT 7
Minter Field Unit #2
Jones County · Minter field · Vertical
Minter Field Unit #2 (API 42-253-33005) is a plugged well in Jones County, plugged June 19, 2013, last operated by Quatro Oil And Gas Inc..
The RRC has issued one drilling permit, issued July 11, 1984, permitted to 3,700 ft.
It was permitted by Jones CO. and has since transferred to Quatro Oil And Gas Inc. on the wellbore schedule.
Completion filings report 8 formation tops, including B/Coleman Junction, B/Coal, Flippen Ls, T/Flippen Ls.
Its 2 leases have reported 102K barrels of oil and 15.4K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Jones Co.; the EWA schedule now lists a different operator.
- Based in
- Joshua, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 12, 2025
- Permits on file
- 136
- Phone
- (940) 767-4443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quatro Oil and Gas Inc. |
| Production reports | Quatro Oil and Gas, Inc.through Apr 2026 |
| Latest permit | Jones Co.Jul 11, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Jul 11, 1984
- last permit issued
- Mar 29, 1995
- completed
- 102K
- cumulative oil, bbl
- 15.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 29, 1995
- Shut in
- —
- Plugged
- Jun 19, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Minter Field Unit O-8-26134 | Minter | Quatro Oil and Gas, Inc. | 8 | 102K | 15.4K | Jan 1993 – Jul 2026 |
| — O-8-20030 | — | — | 0 | 0 | 0 | — |
Oil, barrels lease total
Last 12 months 1,534 · prior 12 1,252(+23%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Staley Oil CompanyJan 1993 → Jun 1999
- 2Quatro Oil and Gas, Inc.Oct 1999 → Apr 2026
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-20030 | — | — | — | — |
| — | — O-8-26134 | — | — | — | — |
| — | — O-8-26134 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,890 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 2,296 | -406 |
| B/Coal | 2,916 | -1,026 |
| Flippen LS | 2,926 | -1,036 |
| T/Flippen LS | 2,926 | -1,036 |
| B/Breck | 3,350 | -1,460 |
| King Sand | 3,384 | -1,494 |
| King SD | 3,384 | -1,494 |
| T/King Sd. | 3,384 | -1,494 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,384 | 3,388 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 12.25 | 125 sx |
| 4.5 | 3,454 | 7.875 | 150 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1996 | Nov 8, 1995 | — |
| 00 | May 11, 1995 | Apr 6, 1995 | — |
| 00 | Apr 10, 1995 | Sep 15, 1994 | — |
| 00 | Oct 18, 1994 | Sep 15, 1994 | — |
| 00 | Sep 20, 1984 | Aug 29, 1984 | — |
| 00 | Sep 13, 1984 | Aug 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-33005 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-33005 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 491K
- bbl, all reported
- Oct 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000075477 | H-1 Injection | Plugged Jul 8, 2013 | 400 | 1,650 | 3,384–3,388 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25333005, documented in the API reference.