TEXAS · WELLS · JONES COUNTY · THOMPSON UNIT LEASE · API 42-253-33478 · DISTRICT 6E

Thompson Unit #1

Plugged

Jones County · Tony P. (Swastika) field  · Vertical

Thompson Unit #1 (API 42-253-33478) is a plugged well in Jones County, plugged February 28, 2011, last operated by Smith Pipe Of Abilene.

The RRC has issued 2 drilling permits between 1986 and 1992, permitted to 3,700 ft.

It was permitted by Tkp Petroleum, Inc. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 5 formation tops, including Dothan, Flippen, Hope Sand, Gunsight.

Operator of record

Smith Pipe of Abilene

Permitted by TKP Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJaset Petroleum Inc.
Production reportsnone
Latest permitTKP Petroleum, Inc.Apr 1, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,700
total depth, ft
2
permits on file
Apr 1, 1992
last permit issued
Aug 13, 2003
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 13, 2003
Shut in
—
Plugged
Feb 28, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson Unit O-8-27245Tony P. (Swastika)Smith Pipe of Abilene100Mar 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
392010-99ReenterTKP Petroleum, Inc.Sep 18, 1991Apr 1, 1992Oct 15, 19913,685
303224-99DrillJaset Petroleum, Inc.Jun 13, 1986Jun 13, 1986—3,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 13, 2003Thompson Unit O-8-27245Tony P. (Swastika)Smith Pipe of AbilenePlugged—
Jun 25, 1986Thompson G-8-121771Tony Paul (Swastika)Jaset Petroleum Inc.Plugged—
Jun 25, 1986Thompson O-8-23948Tony Paul (Swastika)Enexco Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,741 ft elevation.Download CSV →

FormationMD ftSubsea
Dothan2,620-879
Flippen2,986-1,245
Hope Sand3,251-1,510
Gunsight3,537-1,796
Swastika3,624-1,883
Swastika3,632-1,891

Perforations

Perforated and open-hole intervals.

FromToType
3,6313,636Perforated
3,6323,637Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512112.2575 S
4.53,7497.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 2003Aug 22, 2003—
00Nov 16, 1998Aug 18, 1998—
00Oct 4, 1994Aug 11, 1994—
00Aug 19, 1994——
00Oct 29, 1986Sep 11, 1986Yes
00Oct 1, 1986——
00Aug 19, 1986Jul 7, 1986Yes
00Aug 6, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
193K
bbl, all reported
Oct 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081698H-1 InjectionPlugged Mar 10, 20115001,8003,632–3,637

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120082009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25333478, documented in the API reference.