WELL · 42-253-33488 · DISTRICT 7
Shinnery Hope Lime Unit #2
Jones County · Shinnery (Hope Lime) field · Vertical
Shinnery Hope Lime Unit #2 (API 42-253-33488) is a plugged well in Jones County, plugged April 23, 1992, last operated by Smith Pipe Of Abilene.
The RRC has issued 2 drilling permits between 1986 and 1989, permitted to 2,500 ft.
It was permitted by Cottonwood Petroleum CO. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.
Completion filings report one formation top, including Coal Bed.
Its lease has reported 6.11K barrels of oil and 37 mcf of gas since January 1993, last reporting in August 2003. The lease carries 12 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cottonwood Petroleum Co.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 29, 2014
- Phone
- (325) 692-3903
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Pipe of Abilene |
| Production reports | Heart Land Petroleum Corporationthrough Nov 1995 |
| Latest permit | Cottonwood Petroleum Co.Oct 2, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,500
- total depth, ft
- 2
- permits on file
- Oct 2, 1989
- last permit issued
- Sep 28, 1989
- completed
- 6.11K
- cumulative oil, bbl
- 37
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 28, 1989
- Shut in
- —
- Plugged
- Apr 23, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shinnery Hope Lime Unit O-8-25546 | Shinnery (Hope Lime) | Smith Pipe of Abilene | 12 | 6.11K | 37 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cottonwood Petroleum Co.Jan 1993 → Mar 1994
- 2Heart Land Petroleum CorporationApr 1994 → Sep 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 364643-99 | Recompletion | Cottonwood Petroleum Co. | Oct 2, 1989 | Oct 2, 1989 | — | 2,396 |
| 304394-99 | Drill | Cottonwood Petroleum Co. | Jul 21, 1986 | Jul 21, 1986 | Jul 24, 1986 | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-25546 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,714 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coal Bed | 1,982 | -268 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,242 | 2,248 | Perforated |
| 2,370 | 2,382 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 105 | 12.25 | 75 S |
| 4.5 | 2,392 | 6.75 | 320 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 17, 1989 | Oct 2, 1989 | — |
| 00 | Oct 21, 1989 | — | — |
| 00 | Oct 16, 1989 | — | — |
| 00 | Oct 10, 1986 | Oct 3, 1986 | Yes |
| 00 | Oct 7, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-253-33488 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-253-33488 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 442K
- bbl, last 12 reported months
- 745K
- bbl, all reported
- Apr 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000070741 | H-1 Injection | Plugged May 12, 1992 | 200 | 1,000 | 2,242–2,248 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 441,574 · prior 12 303,896(+45%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25333488, documented in the API reference.