WELL · 42-253-34081 · DISTRICT 7

Arnett J.M. #1A

N

Jones County · Bartlett East field  · Vertical

Arnett J.M. #1A (API 42-253-34081) is a well in Jones County operated by Wilco Properties Inc., completed February 1, 1994.

The RRC has issued one drilling permit, issued July 19, 1993, permitted to 3,400 ft.

Completion filings report one formation top, including Swastika.

Its 2 leases have reported 62.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Wilco Properties Inc.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 6, 2008
Permits on file
21
Phone
(214) 521-3222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilco Properties Inc.
Production reportsCoral E&P, LLCthrough Nov 2022
Latest permitWilco Properties, Inc.Jul 19, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,400
total depth, ft
1
permits on file
Jul 19, 1993
last permit issued
Feb 1, 1994
completed
62.8K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 1, 1994
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arnett Unit O-8-27162Bartlett, EastCoral E&P, LLC1560.1K6Apr 1994 – Jul 2026
Arnett, J.M. O-8-2412Bartlett, EastWilco Properties, Inc.92.74K15Jan 1993 – Jun 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encore Energy, Inc.Jan 1993 → May 1993
  2. 2Wilco Properties, Inc.Jun 1993 → Aug 2001
  3. 3Tollett OilSep 2001 → Jun 2011
  4. 4Stephen C. Conley & Assoc. LLCJul 2011 → Aug 2011
  5. 5Kilpatrick Production CompanySep 2011 → Oct 2013
  6. 6Kilpatrick Production Co., Inc.Nov 2013 → Feb 2016
  7. 7Coral E&P, LLCMay 2016 → Nov 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
413737-99DrillWilco Properties, Inc.Jul 12, 1993Jul 19, 1993Jul 20, 19933,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-2412————
—— O-8-27162————

Formation tops

As filed on W-2/G-1. Subsea from 1,828 ft elevation.Download CSV →

FormationMD ftSubsea
Swastika3,203-1,375

Perforations

Perforated and open-hole intervals.

FromToType
3,2023,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510112.2570 S
5.53,3267.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 24, 1994Mar 6, 1994—
00Apr 5, 1994Mar 6, 1994—
00Mar 21, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
40.6K
bbl, all reported
Oct 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000080961H-1 InjectionActive7501,5003,148–3,230

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25334081, documented in the API reference.