TEXAS · WELLS · JONES COUNTY · API 42-253-34498 · DISTRICT 6E

White #1

Y

Jones County · Noodle W. (Palo Pinto) field · Producing  · Vertical

White #1 (API 42-253-34498) is a well in Jones County operated by Sojourner Drilling Corporation, completed December 1, 2002 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 27, 2000, permitted to 4,420 ft.

Completion filings report 3 formation tops, including T/Noodle Cr. Lm, T/Canyon, T/Palo Pinto.

Its 2 leases have reported 36.3K barrels of oil and 81.4K mcf of gas since April 2000, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Sojourner Drilling Corporation

Based in
Abilene, TX
P-5 status
Active (A)
P-5 last filed
Oct 7, 2025
Permits on file
872
Phone
(325) 672-2832

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drlg. Corp.Mar 27, 2000
4,420
total depth, ft
2
permits on file
Mar 27, 2000
last permit issued
Dec 1, 2002
completed
36.3K
cumulative oil, bbl
81.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2000 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
White O-8-29221Noodle, W. (Palo Pinto)Sojourner Drilling Corporation134.6K104Dec 2002 – Apr 2026
White G-8-177022Noodle, W. (Palo Pinto)Sojourner Drilling Corporation11.71K81.3KApr 2000 – Nov 2002

Oil, barrels lease total

Last 12 months 1,049 · prior 12 776(+35%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationApr 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
493382-98DrillSojourner Drlg. Corp.May 10, 2000Mar 27, 2000Mar 31, 20005,000
493382-99DrillSojourner Drlg. Corp.Mar 23, 2000Mar 27, 2000—5,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 1, 2002White O-8-29221Noodle W. (Palo Pinto)Sojourner Drilling CorporationProducing4,420
Apr 15, 2000White G-8-177022Noodle W. (Palo Pinto)Sojourner Drilling CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,843 ft elevation.Download CSV →

FormationMD ftSubsea
T/Noodle Cr. LM2,440-597
T/Canyon4,216-2,373
T/Palo Pinto4,226-2,383

Perforations

Perforated and open-hole intervals.

FromToType
4,2254,227Perforated
4,2344,236Perforated
4,2384,240Perforated
4,2554,227Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62519312.25100 S
4.54,3897.875180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 8, 2003Mar 14, 2003—
00Apr 25, 2003——
00Aug 4, 2000May 9, 2000Yes
00Jun 2, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25334498, documented in the API reference.