WELL · 42-253-35684 · DISTRICT 7

Tiner-Texaco #3B

Y

Jones County · Noodle SW (Strawn Reef) field · Producing  · Vertical

Tiner-Texaco #3B (API 42-253-35684) is a well in Jones County operated by Sojourner Drilling Corporation, completed August 1, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 20, 2022, permitted to 5,000 ft.

Completion filings report 10 formation tops, including Flippen Lime - Disposal, Hope Lime - Disposal, Bluff Creek Sand - Disposal, Coleman Junction.

Its lease has reported 8.09K barrels of oil and 7.51K mcf of gas since August 2022, last reporting in July 2026.

Operator of record

Sojourner Drilling Corporation

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drilling CorporationMay 20, 2022
5,000
total depth, ft
1
permits on file
May 20, 2022
last permit issued
Aug 1, 2022
completed
8.09K
cumulative oil, bbl
7.51K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2022 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

32.589607, -100.105572

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Jones County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tiner-Texaco O-8-32608Noodle,sw (Strawn Reef)Sojourner Drilling Corporation18.09K7.51KAug 2022 – Jul 2026

Oil, barrels lease total

Last 12 months 1,568 · prior 12 2,215(-29%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 1,466 · prior 12 3,306(-56%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationAug 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
880157-99DrillSojourner Drilling CorporationMay 16, 2022May 20, 2022May 26, 20225,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32608————

Formation tops

As filed on W-2/G-1. Subsea from 1,863 ft elevation.Download CSV →

FormationMD ftSubsea
Flippen Lime - Disposal2,779-916
Hope Lime - Disposal2,810-947
Bluff Creek Sand - Disposal——
Coleman Junction——
Dothan Sand - Disposal——
Frye - Disposal——
King Sand - Disposal——
LeonardLEONARD - DISPOSAL——
TannehillTANNEHILL - DISPOSAL——
Valera Sand - Disposal——

Perforations

Perforated and open-hole intervals.

FromToType
4,3204,390Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515212.25100 S
5.54,3207.875220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 14, 2022Sep 12, 2022Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Birdie Unit42-253-35743

1.8 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,880-41
Flippen Lime - Disposal2,675-836
Hope Lime - Disposal2,870-1,031
Valera Sand - Disposal—
Bluff Creek Sand - Disposal—
Dothan Sand - Disposal—
Leonard—
Tannehill—

10 TOPS · FIRST 8

Tiner, J.42-253-31835

2.0 KM · Sojourner Drilling Corporation · Section with this well →

Doothan Lime2,432-538
Noodle Creek2,525-631
Noodle Creek Lime2,529-635
Flippen2,818-924
Gunsight3,096-1,202
Canyon4,174-2,280
Canyon4,394-2,500

Sears 'B'42-253-35594

2.8 KM · Sojourner Drilling Corporation · Section with this well →

Noodle Creek2,630-793
Flippen Lime - Disposal2,705-868
Hope Lime - Disposal2,840-1,003
Coleman Junction—
Dothan Sand - Disposal—
Frye - Disposal—
Leonard—
Tannehill—

10 TOPS · FIRST 8

Hooker Trust42-253-35671

2.8 KM · Sojourner Drilling Corporation · Section with this well →

Flippen Lime - Disposal2,555-740
Coleman Junction—
Dothan Sand - Disposal—
Frye - Disposal—
Hope Lime - Disposal—
King Sand - Disposal—
Leonard—
Tannehill—

10 TOPS · FIRST 8

Kenneth Scott42-253-35535

2.9 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,200-363
Flippen Lime - Disposal2,740-903
Hope Lime - Disposal2,940-1,103
King Sand - Disposal—
Leonard—
Tannehill—
Valera Sand - Disposal—
Frye - Disposal—

10 TOPS · FIRST 8

Dusty Farmer42-253-35687

3.0 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,8329
Flippen Lime - Disposal2,688-847
Hope Lime - Disposal2,868-1,027
King Sand - Disposal3,100-1,259
Bluff Creek Sand - Disposal—
Dothan Sand - Disposal—
Frye - Disposal—
Leonard—

10 TOPS · FIRST 8

Swann, W.D.42-253-35745

3.0 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,222-330
Bluff Creek Sand - Disposal2,750-858
Flippen Lime - Disposal2,814-922
Valera Sand - Disposal—
Dothan Sand - Disposal—
Frye - Disposal—
Hope Lime - Disposal—
King Sand - Disposal—

10 TOPS · FIRST 8

Eoff, Odell et AL42-253-35678

3.3 KM · Sojourner Drilling Corporation · Section with this well →

Noodle Creek2,332-522
Saddle Creek2,528-718
Flippen Lime - Disposal2,577-767
Leonard—
Frye - Disposal—
Dothan Sand - Disposal—
Coleman Junction—
Bluff Creek Sand - Disposal—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25335684, documented in the API reference.