WELL · 42-253-35695 · DISTRICT 7

Cade Freeman Unit #1

Y

Jones County · Jay (Canyon Lime) field · Producing  · Vertical

Cade Freeman Unit #1 (API 42-253-35695) is a well in Jones County operated by Sojourner Drilling Corporation, completed December 1, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 30, 2022, permitted to 5,000 ft.

Completion filings report 10 formation tops, including Leonard, Coleman Junction, Flippen Lime - Disposal, Hope Lime - Disposal.

Its lease has reported 1.5K barrels of oil since December 2022, last reporting in July 2026.

Operator of record

Sojourner Drilling Corporation

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drilling CorporationAug 30, 2022
5,000
total depth, ft
1
permits on file
Aug 30, 2022
last permit issued
Dec 1, 2022
completed
1.5K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2022 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

32.550851, -100.124582

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Jones County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cade Freeman Unit O-8-32648Jay (Canyon Lime)Sojourner Drilling Corporation11.5K0Dec 2022 – Jul 2026

Oil, barrels lease total

Last 12 months 224 · prior 12 247(-9%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationDec 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
883367-99DrillSojourner Drilling CorporationAug 24, 2022Aug 30, 2022Sep 13, 20225,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32648————

Formation tops

As filed on W-2/G-1. Subsea from 1,916 ft elevation.Download CSV →

FormationMD ftSubsea
LeonardLEONARD - DISPOSAL1,750166
Coleman Junction2,240-324
Flippen Lime - Disposal2,796-880
Hope Lime - Disposal2,925-1,009
King Sand - Disposal3,170-1,254
Bluff Creek Sand - Disposal——
Dothan Sand - Disposal——
Frye - Disposal——
TannehillTANNEHILL - DISPOSAL——
Valera Sand - Disposal——

Perforations

Perforated and open-hole intervals.

FromToType
4,4364,445Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510812.2585 S
5.54,4367.875760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 22, 2023Dec 27, 2022Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Jay (Canyon Lime) Unit42-253-35693

1.2 KM · Sojourner Drilling Corporation · Section with this well →

Leonard2701,623
Coleman Junction5201,373
Valera Sand - Disposal7901,103
Noodle Creek2,538-645
Saddle Creek2,765-872
Flippen Lime - Disposal2,820-927
Bluff Creek Sand - Disposal—
Dothan Sand - Disposal—

10 TOPS · FIRST 8

Jay (Canyon Lime) Unit42-253-35744

1.3 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,930-42
Flippen Lime - Disposal2,835-947
Hope Lime - Disposal2,942-1,054
Leonard—
Bluff Creek Sand - Disposal—
Frye - Disposal—
Dothan Sand - Disposal—
King Sand - Disposal—

10 TOPS · FIRST 8

Swann, W.D.42-253-30623

2.3 KM · Sojourner Drilling Corporation · Section with this well →

Noodle Creek2,500-630
Saddle Creek2,750-880

Swann, W.D.42-253-35745

2.4 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction2,222-330
Bluff Creek Sand - Disposal2,750-858
Flippen Lime - Disposal2,814-922
Leonard—
King Sand - Disposal—
Hope Lime - Disposal—
Frye - Disposal—
Dothan Sand - Disposal—

10 TOPS · FIRST 8

Swann, W.D.42-253-35691

2.4 KM · Sojourner Drilling Corporation · Section with this well →

Valera Sand - Disposal7101,158
Coleman Junction1,570298
Noodle Creek2,490-622
Flippen Lime - Disposal2,564-696
Hope Lime - Disposal—
Bluff Creek Sand - Disposal—
Dothan Sand - Disposal—
Frye - Disposal—

10 TOPS · FIRST 8

Tiner, J.42-253-31835

2.8 KM · Sojourner Drilling Corporation · Section with this well →

Doothan Lime2,432-538
Noodle Creek2,525-631
Noodle Creek Lime2,529-635
Flippen2,818-924
Gunsight3,096-1,202
Canyon4,174-2,280
Canyon4,394-2,500

Sears 'B'42-253-35594

3.2 KM · Sojourner Drilling Corporation · Section with this well →

Noodle Creek2,630-793
Flippen Lime - Disposal2,705-868
Hope Lime - Disposal2,840-1,003
Leonard—
Valera Sand - Disposal—
Tannehill—
Frye - Disposal—
Dothan Sand - Disposal—

10 TOPS · FIRST 8

Dusty Farmer42-253-35687

3.3 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,8329
Flippen Lime - Disposal2,688-847
Hope Lime - Disposal2,868-1,027
King Sand - Disposal3,100-1,259
Dothan Sand - Disposal—
Frye - Disposal—
Valera Sand - Disposal—
Bluff Creek Sand - Disposal—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25335695, documented in the API reference.