TEXAS · WELLS · KARNES COUNTY · API 42-255-30793 · DISTRICT 02

Korth #1

Plugged

Karnes County · Patton (Austin Chalk) field  · Vertical

Korth #1 (API 42-255-30793) is a plugged well in Karnes County, plugged October 2, 1981, last operated by Henry Petroleum Corp..

The RRC has issued one drilling permit, issued August 4, 1980, permitted to 9,225 ft.

Operator of record

Henry Petroleum Corp.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 19, 2000
Permits on file
537
Phone
(432) 694-3000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHenry Petroleum Corp.
Production reportsnone
Latest permitHenry Petroleum Corp.Aug 4, 1980
9,225
total depth, ft
1
permits on file
Aug 4, 1980
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 2, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
88553-99DrillHenry Petroleum Corp.Aug 4, 1980Aug 4, 1980—9,225

Completions

CompletedLeaseFieldOperatorStatusDepth
—Korth O-2-6277Patton (Austin Chalk)Henry Petroleum Corp.Plugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25530793, documented in the API reference.