WELL · 42-255-31228 · DISTRICT 2

Estelle Rolf Gas Unit #5

Y

Karnes County · Kenedy SW. (Edwards) field · Producing  · Vertical

Estelle Rolf Gas Unit #5 (API 42-255-31228) is a well in Karnes County operated by Blackbrush O & G LLC, completed August 20, 1989 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 17, 1989, permitted to 14,000 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Blackbrush O & G LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Queen City, Wilcox, Navarro, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Blackbrush O & G LLC

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Sep 16, 2025
Permits on file
339
Phone
(210) 495-5577

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlackbrush O & G LLC
Production reportsBlackbrush O & G, LLCthrough Apr 2026
Latest permitMobil Producing TX. & N.M. Inc.Apr 17, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Apr 17, 1989
last permit issued
Aug 20, 1989
completed
0
cumulative oil, bbl
2.75M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 20, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Estelle Rolf Gas Unit G-2-131972Kenedy, SW. (Edwards)Blackbrush O & G, LLC102.75MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 61,521 · prior 12 56,933(+8%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parker & Parsley Development Co.Jan 1993 → Feb 1995
  2. 2Parker & Parsley Development L.PMar 1995 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Sep 2019
  4. 4Ensign Operating LLCOct 2019 → Sep 2022
  5. 5BB-Southtex, LLCOct 2022 → Aug 2024
  6. 6Blackbrush O & G, LLCSep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
358129-99DrillMobil Producing TX. & N.M. Inc.Apr 14, 1989Apr 17, 1989May 11, 198914,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-131972————

Formation tops

As filed on W-2/G-1. Subsea from 482 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City4,565-4,083
Wilcox5,655-5,173
WilcoxLOWER WILCOX8,868-8,386
Navarro10,740-10,258
Austin ChalkAUSTIN12,600-12,118
Edwards12,955-12,473

Perforations

Perforated and open-hole intervals.

FromToType
13,08413,356Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1680——
9.6253,02513.751,100 S
5.513,4187.8752,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 30, 1989Sep 28, 1989Yes
00Oct 20, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25531228, documented in the API reference.