TEXAS · WELLS · KARNES COUNTY · API 42-255-31695 · DISTRICT 02

Orr Unit #5H

Shut in

Karnes County · Eagleville (Eagle Ford-2) field · Shut In  · Horizontal

Orr Unit #5H (API 42-255-31695) is a horizontal well in Karnes County operated by Eog Resources Inc., completed December 7, 2021 and listed as shut in on the RRC schedule, shut in June 1, 2023.

The RRC has issued one drilling permit, issued July 1, 2010, permitted to 10,752 ft.

Completion filings report 6 formation tops, including Midway, Navarro, Olmos, Anacacho.

Its 2 leases have reported 671K barrels of oil and 644K mcf of gas since May 2010, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Apr 2026
Latest permitEOG Resources, Inc.Jul 1, 2010
10,752
total depth, ft
1
permits on file
Jul 1, 2010
last permit issued
Dec 7, 2021
completed
671K
cumulative oil, bbl
644K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 7, 2021
Shut in
Jun 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Orr Unit O-2-9510Eagleville (Eagle Ford-2)EOG Resources, Inc.5554K590KDec 2010 – Jul 2026
Orr Unit O-2-9463Eagleville (Eagle Ford)EOG Resources, Inc.5116K54.3KMay 2010 – Jan 2012

Oil, barrels lease total

Last 12 months 2,184 · prior 12 2,003(+9%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 2,375 · prior 12 4,196(-43%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Sep 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698368-99DrillEOG Resources, Inc.Jun 30, 2010Jul 1, 2010Jul 28, 201012,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 7, 2021Orr Unit O-2-9510Eagleville (Eagle Ford-2)EOG Resources Inc.Shut In · shut in Jun 1, 202310,752
Sep 6, 2010Orr Unit O-2-9463Eagleville (Eagle Ford)EOG Resources Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 377 ft elevation.Download CSV →

FormationMD ftSubsea
Midway6,797-6,420
Navarro7,811-7,434
Olmos8,516-8,139
Anacacho9,886-9,509
Anacacho10,077-9,700
Austin Chalk10,164-9,787
Eagle Ford10,315-9,938
Eagle FordEAGLEFORD11,330-10,953

Perforations

Perforated and open-hole intervals.

FromToType
12,00014,689Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,24812.251,670 S
5.514,9858.752,075 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 6, 2022Dec 14, 2021—
00Oct 26, 2011Jan 18, 2011Yes
00Jun 28, 2011Sep 16, 2010Yes
00Mar 11, 2011Sep 16, 2010Yes
00Feb 22, 2011——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25531695, documented in the API reference.