WELL · 42-255-31760 · DISTRICT 2

Turnbull #4H

N

Karnes County · Eagleville (Eagle Ford) field  · Horizontal

Turnbull #4H (API 42-255-31760) is a horizontal well in Karnes County operated by Marathon Oil EF LLC, completed November 13, 2010.

The RRC has issued 2 drilling permits (amended once) between 2010 and 2011, permitted to 13,500 ft.

Completion filings report 4 formation tops, including Anacacho, Austin Chalk, Upper Ef, Eagle Ford.

Its 3 leases have reported 2.52M barrels of oil and 7.44M mcf of gas since April 2010, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

Operator of record

Marathon Oil EF LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 26, 2025
Permits on file
3,191
Phone
(832) 486-2737

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Apr 2026
Latest permitMarathon Oil EF LLCDec 2, 2011
13,500
total depth, ft
3
permits on file
Dec 2, 2011
last permit issued
Nov 13, 2010
completed
2.52M
cumulative oil, bbl
7.44M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 13, 2010
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Turnbull Unit A O-2-9596Eagleville (Eagle Ford-2)Marathon Oil EF LLC9645K1.74MDec 2010 – Jul 2026
Turnbull Unit D O-2-10654Eagleville (Eagle Ford-2)Marathon Oil EF LLC111.76M5.46MNov 2011 – Jul 2026
Turnbull O-2-9503Eagleville (Eagle Ford)Marathon Oil EF LLC4112K242KApr 2010 – Sep 2012

Oil, barrels lease total

Last 12 months 38,333 · prior 12 47,194(-19%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 107,187 · prior 12 69,685(+54%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyJun 2010 → Oct 2011
  2. 2Marathon Oil EF LLCNov 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
729072-98RecompletionMarathon Oil EF LLCDec 20, 2011Dec 2, 2011Oct 28, 201013,500
729072-99RecompletionMarathon Oil EF LLCNov 29, 2011Dec 2, 2011—13,500
702946-99DrillHilcorp Energy CompanySep 29, 2010Oct 1, 2010Oct 27, 201013,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-9503————
—— O-2-9596————
—— O-2-10654————

Formation tops

As filed on W-2/G-1. Subsea from 369 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho11,155-10,786
Austin Chalk11,323-10,954
Upper EF11,444-11,075
Eagle FordEAGLEFORD11,485-11,116
Eagle Ford11,550-11,181
Eagle FordEAGLEFORD11,550-11,181

Perforations

Perforated and open-hole intervals.

FromToType
11,17516,354Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,80013.51,710 S
5.516,4588.52,245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 19, 2013Jun 7, 2012—
00Jun 29, 2012Jun 7, 2012—
00Jun 28, 2012Mar 13, 2012—
00Nov 3, 2011Jul 7, 2011—
00Sep 21, 2011Jan 7, 2011—
00Mar 8, 2011Jan 7, 2011—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25531760, documented in the API reference.