TEXAS · WELLS · KARNES COUNTY · NANCY STEWART 01 LEASE · API 42-255-32593 · DISTRICT 02

Nancy Stewart 01 #04H

Y

Karnes County · Sugarkane (Eagle Ford) field · Producing  · Horizontal

Nancy Stewart 01 #04H (API 42-255-32593) is a horizontal well in Karnes County operated by Marathon Oil EF LLC, completed February 2, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 16, 2012, permitted to 13,164 ft.

It was permitted by Pioneer Natural Res. USA, Inc. and has since transferred to Marathon Oil EF LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Midway, Austin Chalk, Top Efgd.

Its lease has reported 175K barrels of oil and 1.29M mcf of gas since February 2013, last reporting volume in April 2026.

Operator of record

Marathon Oil EF LLC

Permitted by Pioneer Natural Res. USA, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 26, 2025
Permits on file
3,191
Phone
(832) 486-2737

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Apr 2026
Latest permitPioneer Natural Res. USA, Inc.Aug 16, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,164
total depth, ft
1
permits on file
Aug 16, 2012
last permit issued
Feb 2, 2013
completed
175K
cumulative oil, bbl
1.29M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 2, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nancy Stewart 01 G-2-269560Sugarkane (Eagle Ford)Marathon Oil EF LLC1175K1.29MFeb 2013 – Apr 2026

Gas, mcf lease total

Last 12 months 10,584 · prior 12 8,831(+20%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pioneer Natural Res. USA, Inc.Feb 2013 → Sep 2019
  2. 2Ensign Operating LLCOct 2019 → Feb 2023
  3. 3Marathon Oil EF LLCMar 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
742529-99DrillPioneer Natural Res. USA, Inc.Jun 9, 2012Aug 16, 2012Oct 19, 201221,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 2, 2013Nancy Stewart 01 G-2-269560Sugarkane (Eagle Ford)Marathon Oil EF LLCProducing13,164

Formation tops

As filed on W-2/G-1. Subsea from 235 ft elevation.Download CSV →

FormationMD ftSubsea
Midway9,130-8,895
Austin ChalkAUSTIN CHALK, UPPER13,013-12,778
Top Efgd13,267-13,032

Perforations

Perforated and open-hole intervals.

FromToType
13,60819,349Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37587817.51,150 S
9.6259,37112.25410 S
5.519,4958.52,012 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 9, 2013Feb 26, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25532593, documented in the API reference.