TEXAS · WELLS · KARNES COUNTY · DAVIS A LEASE · API 42-255-32714 · DISTRICT 02
Davis A #3H
Karnes County · Eagleville (Eagle Ford-2) field · Producing · Horizontal
Davis A #3H (API 42-255-32714) is a horizontal well in Karnes County operated by Bpx Operating Company, completed April 11, 2013 and listed as producing on the RRC schedule, shut in June 1, 2019.
The RRC has issued one drilling permit, issued August 14, 2012, permitted to 11,213 ft.
It was permitted by Petrohawk Operating Company and has since transferred to Bpx Operating Company on the wellbore schedule.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
Its lease has reported 2.34M barrels of oil and 2.24M mcf of gas since September 2012, last reporting volume in April 2026. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 24, 2026
- Permits on file
- 1,576
- Phone
- (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BPX Operating Company |
| Production reports | BPX Operating Companythrough Apr 2026 |
| Latest permit | Petrohawk Operating CompanyAug 14, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,213
- total depth, ft
- 1
- permits on file
- Aug 14, 2012
- last permit issued
- Apr 11, 2013
- completed
- 2.34M
- cumulative oil, bbl
- 2.24M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 11, 2013
- Shut in
- Jun 1, 2019
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis A O-2-10472 | Eagleville (Eagle Ford-2) | BPX Operating Company | 8 | 2.34M | 2.24M | Sep 2012 – Apr 2026 |
Oil, barrels lease total
Last 12 months 128,285 · prior 12 157,973(-19%)
Gas, mcf lease total
Last 12 months 164,304 · prior 12 213,081(-23%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petrohawk Operating CompanyApr 2013 → Jul 2013
- 2BHP Billiton Pet(txla OP) CoAug 2013 → Jul 2019
- 3BPX Operating CompanyAug 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 745985-99 | Drill | Petrohawk Operating Company | Aug 7, 2012 | Aug 14, 2012 | Mar 1, 2013 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 11, 2013 | Davis A O-2-10472 | Eagleville (Eagle Ford-2) | BPX Operating Company | Producing · shut in Jun 1, 2019 | 11,213 |
Formation tops
As filed on W-2/G-1. Subsea from 292 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 11,108 | -10,816 |
| Austin Chalk | 11,217 | -10,925 |
| Eagle FordEAGLEFORD SHALE | 11,509 | -11,217 |
| Eagle FordEAGLEFORD SHALE | 11,541 | -11,249 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,700 | 17,372 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,520 | 12.25 | 1,273 S |
| 5.5 | 10,024 | 8.75 | 2,255 S |
| 4.5 | 17,463 | 6.75 | 2,255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 26, 2013 | Aug 9, 2013 | — |
| 00 | Jul 18, 2013 | Jun 6, 2013 | Yes |
| 00 | Jun 7, 2013 | Apr 9, 2013 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Apr 14, 2016. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITY | TIFF | 0 to 3,106 | Apr 14, 2016run Aug 25, 2012 | 0.97 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-255-32714 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-255-32714 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/25532714, documented in the API reference.