TEXAS · WELLS · KARNES COUNTY · WINGNUT UNIT 'B' LEASE · API 42-255-32927 · DISTRICT 02

Wingnut Unit B #4H

Shut in

Karnes County · Eagleville (Eagle Ford-2) field · Shut In  · Horizontal

Wingnut Unit B #4H (API 42-255-32927) is a horizontal well in Karnes County operated by Ensign Natural Resources II LLC, completed November 22, 2015 and listed as shut in on the RRC schedule, shut in December 1, 2020.

The RRC has issued one drilling permit, issued January 2, 2013, permitted to 12,374 ft.

It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Wilcox, Midway, Escondido, Olmos.

Its lease has reported 3.13M barrels of oil and 4.97M mcf of gas since December 2012, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Ensign Natural Resources II LLC

Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 29, 2026
Permits on file
13
Phone
(346) 809-4062

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnsign Natural Resources II LLC
Production reportsMarathon Oil EF LLCthrough Apr 2026
Latest permitMarathon Oil EF LLCJan 2, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,374
total depth, ft
1
permits on file
Jan 2, 2013
last permit issued
Nov 22, 2015
completed
3.13M
cumulative oil, bbl
4.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 22, 2015
Shut in
Dec 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wingnut Unit 'B' O-2-10366Eagleville (Eagle Ford-2)Marathon Oil EF LLC103.13M4.97MDec 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 64,611 · prior 12 75,692(-15%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 129,529 · prior 12 158,684(-18%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
753726-99DrillMarathon Oil EF LLCDec 21, 2012Jan 2, 2013May 6, 201318,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 22, 2015Wingnut Unit B O-2-10366Eagleville (Eagle Ford-2)Ensign Natural Resources II LLCShut In · shut in Dec 1, 202012,374

Formation tops

As filed on W-2/G-1. Subsea from 502 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox4,753-4,251
Midway8,848-8,346
Escondido9,865-9,363
Olmos10,393-9,891
Anacacho11,389-10,887
Austin Chalk11,590-11,088
Eagle Ford12,007-11,505

Perforations

Perforated and open-hole intervals.

FromToType
12,46917,446Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,97512.25925 S
5.517,5358.51,995 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 15, 2016Nov 18, 2016—
00Dec 12, 2016Nov 18, 2016—
00Aug 26, 2013Jun 18, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25532927, documented in the API reference.