WELL · 42-255-34195 · DISTRICT 2

Bishop Brogan SA 2 #2H

Y

Karnes County · Eagleville (Eagle Ford-2) field · Producing  · Horizontal

Bishop Brogan SA 2 #2H (API 42-255-34195) is a horizontal well in Karnes County operated by Tbm Catarina LLC, completed March 16, 2015 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 9, 2014, permitted to 12,000 ft.

It was permitted by Matador Production Company and has since transferred to Tbm Catarina LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Frio, Yegua, Queen City, Reklaw.

Its lease has reported 138K barrels of oil and 349K mcf of gas since March 2015, last reporting in July 2026.

Operator of record

TBM Catarina LLC

Permitted by Matador Production Company; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 3, 2026
Permits on file
10
Phone
(817) 698-9901

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTBM Catarina LLC
Production reportsTBM Catarina, LLCthrough Apr 2026
Latest permitMatador Production CompanyOct 9, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Oct 9, 2014
last permit issued
Mar 16, 2015
completed
138K
cumulative oil, bbl
349K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 16, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bishop Brogan SA 2 O-2-11150Eagleville (Eagle Ford-2)TBM Catarina, LLC1138K349KMar 2015 – Jul 2026

Oil, barrels lease total

Last 12 months 4,245 · prior 12 4,454(-5%)

05001K202420252026

Gas, mcf lease total

Last 12 months 2,086 · prior 12 2,535(-18%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Matador Production CompanyMar 2015 → Feb 2025
  2. 2TBM Catarina, LLCMar 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
797506-98DrillMatador Production CompanyDec 29, 2014Oct 9, 2014Dec 15, 201412,000
797506-99DrillMatador Production CompanyOct 1, 2014Oct 9, 2014Dec 15, 201412,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-11150————

Formation tops

As filed on W-2/G-1. Subsea from 403 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO - DISPOSAL500-97
YeguaYEGUA - DISPOSAL1,337-934
Queen City3,428-3,025
Reklaw3,551-3,148
Carrizo4,140-3,737
WilcoxWILCOX - DISPOSAL4,451-4,048
Austin ChalkAUSTIN CHALK - H2S10,915-10,512
Eagle FordEAGLE FORD - H2S11,075-10,672
EdwardsEDWARDS - H2S——
SligoSLIGO - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
11,32615,063Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,34312.251,400 S
5.515,2088.752,274 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 8, 2016Jan 18, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25534195, documented in the API reference.