TEXAS · WELLS · KARNES COUNTY · MAVERICK UNIT LEASE · API 42-255-34423 · DISTRICT 02

Maverick Unit #3H

Y

Karnes County · Eagleville (Eagle Ford-2) field · Shut In  · Horizontal

Maverick Unit #3H (API 42-255-34423) is a horizontal well in Karnes County operated by Eog Resources Inc., completed May 4, 2016 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued December 22, 2014, permitted to 10,879 ft.

Completion filings report 10 formation tops, including Frio, Yegua, Queen City, Reklaw.

Its lease has reported 2.14M barrels of oil and 3.2M mcf of gas since June 2014, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Apr 2026
Latest permitEOG Resources, Inc.Dec 22, 2014
10,879
total depth, ft
3
permits on file
Dec 22, 2014
last permit issued
May 4, 2016
completed
2.14M
cumulative oil, bbl
3.2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 4, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maverick Unit O-2-10867Eagleville (Eagle Ford-2)EOG Resources, Inc.62.14M3.2MJun 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 39,682 · prior 12 42,313(-6%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 72,163 · prior 12 69,686(+4%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Jun 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
801827-97DrillEOG Resources, Inc.Apr 19, 2016Dec 22, 2014Aug 4, 201511,500
801827-98DrillEOG Resources, Inc.Sep 15, 2015Dec 22, 2014Aug 4, 201511,500
801827-99DrillEOG Resources, Inc.Dec 16, 2014Dec 22, 2014Aug 4, 201511,500

Completions

CompletedLeaseFieldOperatorStatusDepth
May 4, 2016Maverick Unit O-2-10867Eagleville (Eagle Ford-2)EOG Resources Inc.Shut In10,879

Formation tops

As filed on W-2/G-1. Subsea from 310 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO - DISPOSAL690-380
YeguaYEGUA - DISPOSAL1,500-1,190
Queen City2,835-2,525
Reklaw3,380-3,070
WilcoxWILCOX - DISPOSAL3,945-3,635
Austin ChalkAUSTIN CHALK - H2S10,349-10,039
Eagle FordEAGLE FORD - H2S10,574-10,264
Carrizo——
EdwardsEDWARDS - H2S——
SligoSLIGO - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
11,02413,898Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,15912.25785 S
5.513,9928.52,045 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 2016May 27, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25534423, documented in the API reference.