TEXAS · WELLS · KARNES COUNTY · NATHO UNIT A LEASE · API 42-255-35062 · DISTRICT 02

Natho Unit A #5

Y

Karnes County · Eagleville (Eagle Ford-2) field · Producing  · Horizontal

Natho Unit A #5 (API 42-255-35062) is a horizontal well in Karnes County operated by Burlington Resources O & G CO LP, completed October 24, 2017 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 19, 2016, permitted to 12,460 ft.

Completion filings report 10 formation tops, including Yegua, Queen City, Reklaw, Carrizo.

Its lease has reported 5.1M barrels of oil and 8.16M mcf of gas since July 2011, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Burlington Resources O & G Co LP

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 30, 2025
Permits on file
5,133
Phone
(832) 486-2737

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurlington Resources O & G Co LP
Production reportsBurlington Resources O & G Co LPthrough Apr 2026
Latest permitBurlington Resources O & G Co LPJul 19, 2016
12,460
total depth, ft
1
permits on file
Jul 19, 2016
last permit issued
Oct 24, 2017
completed
5.1M
cumulative oil, bbl
8.16M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 24, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Natho Unit A O-2-9754Eagleville (Eagle Ford-2)Burlington Resources O & G Co LP135.1M8.16MJul 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 87,442 · prior 12 223,441(-61%)

020K40K60K202420252026

Gas, mcf lease total

Last 12 months 155,377 · prior 12 444,370(-65%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burlington Resources O & G Co LPDec 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
817137-99DrillBurlington Resources O & G Co LPJul 19, 2016Jul 19, 2016Sep 12, 201617,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 24, 2017Natho Unit A O-2-9754Eagleville (Eagle Ford-2)Burlington Resources O & G Co LPProducing12,460

Formation tops

As filed on W-2/G-1. Subsea from 369 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA - DISPOSAL1,678-1,309
Queen City3,809-3,440
Reklaw4,605-4,236
Reklaw4,615-4,246
Carrizo4,889-4,520
Carrizo4,890-4,521
WilcoxWILCOX - DISPOSAL5,040-4,671
Austin ChalkAUSTIN CHALK - H2S11,682-11,313
Eagle FordEAGLE FORD - H2S11,927-11,558
EdwardsEDWARDS - H2S——
FrioFRIO - DISPOSAL——
SligoSLIGO - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
12,11119,059Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,44712.25980 S
5.519,2048.752,125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 26, 2018Nov 16, 2017Yes
00Apr 11, 2017Mar 31, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25535062, documented in the API reference.