TEXAS · WELLS · KENEDY COUNTY · API 42-261-00301 · DISTRICT 04

Sarita Field Oil & Gas Unit #60

Plugged

Kenedy County · Sarita ( 3-E) field  · Vertical

Sarita Field Oil & Gas Unit #60 (API 42-261-00301) is a plugged well in Kenedy County, plugged October 16, 1995, last operated by Exxon Mobil Corporation.

The RRC has issued one drilling permit, issued October 18, 1983, permitted to 7,010 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Its 2 leases have reported 19.5K barrels of oil and 33K mcf of gas since January 1993, last reporting in October 2010. The leases carry 12 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsExxon Corp.through Apr 1998
Latest permitExxon Corp.Oct 18, 1983
7,010
total depth, ft
1
permits on file
Oct 18, 1983
last permit issued
Oct 10, 1989
completed
19.5K
cumulative oil, bbl
33K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 10, 1989
Shut in
—
Plugged
Oct 16, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field Oil & Gas Unit O-4-6963Sarita ( 3-E)Exxon Mobil Corporation1119.5K33KJan 1993 – Oct 2010
Sarita Field Oil & Gas Unit G-4-69812Sarita (11-a & B, E)Exxon Corp.100Jan 1993 – Oct 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Apr 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
217480-99RecompletionExxon Corp.Oct 13, 1983Oct 18, 1983—7,010

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 10, 1989Sarita Field Oil & Gas Unit O-4-6963Sarita ( 3-E)Exxon Mobil CorporationPlugged—
Jun 25, 1984Sarita Field Oil & Gas Unit O-4-6963Sarita ( 3-E)Exxon Mobil CorporationPlugged—
Nov 28, 1976Sarita Field Oil & Gas Unit G-4-69812Sarita (11-a & B E)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit O-4-6975Sarita (12-a C)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit O-4-6965Sarita ( 5-KLM C)Exxon Mobil CorporationPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,6113,623Perforated
3,6633,670Perforated
3,6793,681Perforated
—6,312Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
16501——
1651120330 S
10.752,399——
10.752,412151,070 S
2.8754,846——
2.8754,8589.8751,220 S
2.8756,447——
2.8756,4609.8751,220 sx
2.8756,460——
2.8756,473——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 1990Nov 1, 1989—
00Nov 23, 1989——
00Oct 1, 1984Aug 22, 1984—
00Jan 12, 1984Aug 22, 1984—
00Jan 12, 1984Feb 7, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26100301, documented in the API reference.