TEXAS · WELLS · KENEDY COUNTY · API 42-261-00320 · DISTRICT 04

Sarita Field Oil & Gas Unit #64

Plugged

Kenedy County · Sarita ( 7-B E) field  · Vertical

Sarita Field Oil & Gas Unit #64 (API 42-261-00320) is a plugged well in Kenedy County, plugged April 21, 1987, last operated by Exxon Mobil Corporation.

The RRC has issued 2 drilling permits between 1982 and 1984, permitted to 7,300 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsnone
Latest permitExxon Corp.Jun 1, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,300
total depth, ft
2
permits on file
Jun 1, 1984
last permit issued
Oct 12, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 12, 1984
Shut in
—
Plugged
Apr 21, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
240775-99RecompletionExxon Corp.May 31, 1984Jun 1, 1984—6,950
161441-99RecompletionExxon Corp.May 21, 1982May 21, 1982—7,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 12, 1984Sarita Field Oil & Gas Unit O-4-6967Sarita ( 7-B E)Exxon Mobil CorporationPlugged—
Oct 10, 1984Sarita Field Oil & Gas Unit O-4-6964Sarita ( 5-G & H E)Exxon Mobil CorporationPlugged—
May 1, 1969— G-4-46133Sarita ( 5-D)Humble Oil & Refining Co.Plugged—
Feb 1, 1966— G-4-38905Sarita (14-E C)Humble Oil & Refining Co.Plugged—
Apr 1, 1965— G-4-36471Sarita ( 4-H)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit O-4-7217Sarita ( 6-A)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit G-4-44180Sarita ( 2-M)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit G-4-49577Sarita ( 2-F)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,6452,648Perforated
3,5983,603Perforated
3,6253,632Perforated
4,1024,114Perforated
4,4244,432Perforated
5,4045,399Perforated
—4,592Perforated
—5,042Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1648415—
16484——
1649820330 S
10.752,435——
10.752,436——
10.752,44915—
10.752,44916—
2.8755,5189.875—
2.8755,518——
2.8755,5229.875—
2.8755,522——
2.8755,5309.875725 S
2.8755,53010.75725 S
2.8755,5349.875—
2.8755,53510.75—
2.8756,9099.875—
2.8756,909——
2.8756,9229.875350 S
2.8756,92210.75350 S
2.8756,9279.875—
2.8756,927——
2.8756,9409.875—
2.8756,94010.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 8, 1985Jun 4, 1985—
00Jun 20, 1985Jun 4, 1985—
00Jan 12, 1984Dec 2, 1976—
00Jan 12, 1984Feb 3, 1971—
00Jan 12, 1984Jun 6, 1968—
00Jan 12, 1984Mar 23, 1965—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26100320, documented in the API reference.