TEXAS · WELLS · KENEDY COUNTY · API 42-261-30026 · DISTRICT 04

Sarita Field Oil & Gas Unit #125

Plugged

Kenedy County · Sarita ( 6-A) field  · Vertical

Sarita Field Oil & Gas Unit #125 (API 42-261-30026) is a plugged well in Kenedy County, plugged October 31, 1995, last operated by Exxon Corp..

The RRC has issued 8 drilling permits (amended once) between 1980 and 1992, permitted to 7,620 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Mar 11, 1992
7,620
total depth, ft
9
permits on file
Mar 11, 1992
last permit issued
May 2, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 2, 1990
Shut in
—
Plugged
Oct 31, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-4-55504——000—
Sarita Field Oil & Gas Unit G-4-110202Sarita (11-a & B, E)Exxon Corp.100Jan 1993 – —
— G-4-111245——000—
Sarita Field Oil & Gas Unit G-4-134831Sarita ( 6-A)Exxon Corp.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
397287-98RecompletionExxon Corp.Dec 23, 1992Mar 11, 1992—7,620
397287-99RecompletionExxon Corp.Mar 6, 1992Mar 11, 1992—7,620
369669-99RecompletionExxon Corp.Feb 9, 1990Feb 12, 1990—7,620
361859-99RecompletionExxon Corp.Jul 24, 1989Jul 26, 1989—7,620
331416-99RecompletionExxon Corp.Jun 10, 1987Jun 12, 1987—7,620
297718-99RecompletionExxon Corp.Feb 11, 1986Feb 13, 1986—7,620
268530-99RecompletionExxon Corp.Mar 4, 1985Mar 5, 1985—7,620
224435-99RecompletionExxon Corp.Apr 23, 1984Dec 23, 1983—7,620
93027-99OtherExxon Corp.Sep 18, 1980Sep 18, 1980—7,620

Completions

CompletedLeaseFieldOperatorStatusDepth
May 2, 1990Sarita Field Oil & Gas Unit G-4-134831Sarita ( 6-A)Exxon Corp.Plugged—
Nov 12, 1989Sarita Field Oil & Gas Unit O-4-10608WildcatHeadington Energy Partners LLCPlugged—
Feb 1, 1989Sarita Field Oil & Gas Unit G-4-110202Sarita (11-a & B E)Exxon Corp.Plugged—
Feb 1, 1989Sarita Field Oil & Gas Unit G-4-110202Sarita (11-a & B E)Exxon Corp.Plugged—
Feb 1, 1989Sarita Field Oil & Gas Unit G-4-110202Sarita (11-a & B E)Exxon Corp.Plugged—
Feb 1, 1989Sarita Field Oil & Gas Unit G-4-110202Sarita (11-a & B E)Exxon Corp.Plugged—
Jul 29, 1985Sarita Field Oil & Gas Unit G-4-111245Sarita (15-F C)Exxon Corp.Plugged—
Jul 29, 1985Sarita Field Oil & Gas Unit G-4-111245Sarita (15-F C)Exxon Corp.Plugged—
Oct 10, 1980Sarita FLD Oil 9 Gas Unit G-4-91577Sarita (13-D & E)Exxon Corp.Plugged—
Oct 11, 1972Sarita Field Oil & Gas Unit G-4-55504Sarita ( 3-B)Exxon Corp.Plugged—
Mar 1, 1972— G-4-52254Sarita (14-F)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit G-4-70559Sarita (15-K C)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit O-4-6984Sarita (14-H C)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit O-4-6979Sarita (14-C)Exxon Corp.Plugged—
—Sarita Field Oil & Gas Unit O-4-7217Sarita ( 6-A)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,5423,556Perforated
4,7004,710Perforated
5,0225,029Perforated
5,1065,113Perforated
5,1135,130Perforated
5,1615,165Perforated
5,6925,696Perforated
6,1216,138Perforated
6,4806,497Perforated
6,5266,533Perforated
6,7986,810Perforated
7,0487,058Perforated
—5,050Perforated
—6,882Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37553818.5400 S
8.6252,79112.25825 S
8.6252,79212.25825 S
2.8757,6187.875925 S
2.8757,618——
2.8757,6197.875925 S
2.8757,619——
2.8757,6207.875925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 17, 1990May 29, 1990Yes
00Jun 14, 1990——
00Apr 26, 1990Jan 9, 1990Yes
00Mar 21, 1990——
00Apr 6, 1989Mar 3, 1989Yes
00Nov 7, 1986Sep 17, 1986Yes
00Sep 17, 1985Aug 27, 1985—
00Jul 16, 1984Jun 20, 1984—
00Jul 12, 1984Jun 20, 1984—
00May 29, 1984Apr 19, 1984—
00May 15, 1984Apr 19, 1984—
00Jan 12, 1984Nov 19, 1980—
00Jan 12, 1984Jan 20, 1976—
00Jan 12, 1984Aug 13, 1970—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130026, documented in the API reference.