TEXAS · WELLS · KENEDY COUNTY · API 42-261-30429 · DISTRICT 04
East S. K. Mrs. #94
Kenedy County · Rita (Consolidated) field · Vertical
East S. K. Mrs. #94 (API 42-261-30429) is a plugged well in Kenedy County, plugged June 21, 2018, last operated by Headington Energy Partners LLC.
The RRC has issued 11 drilling permits (amended once) between 1978 and 1993, permitted to 8,000 ft.
It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.
Its 5 leases have reported 294K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Headington Energy Partners LLC
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 26, 2025
- Permits on file
- 175
- Phone
- (361) 885-0110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Headington Energy Partners LLC |
| Production reports | Headington Energy Partners, LLCthrough Jul 2013 |
| Latest permit | Exxon Corp.Sep 21, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 12
- permits on file
- Sep 21, 1993
- last permit issued
- Oct 24, 1993
- completed
- 0
- cumulative oil, bbl
- 294K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 24, 1993
- Shut in
- —
- Plugged
- Jun 21, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| East, S. K. Mrs. G-4-148989 | Rita (Consolidated) | Headington Energy Partners, LLC | 1 | 0 | 293K | Oct 1993 – Jul 2013 |
| East, Mrs. S.K. G-4-139427 | Rita (Consolidated) | Headington Energy Partners, LLC | 1 | 0 | 1.04K | Jan 1993 – Aug 1993 |
| East, S.K. Mrs. G-4-107484 | Rita (7-B, II) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – — |
| — G-4-114278 | — | — | 0 | 0 | 0 | — |
| East, S. K. Mrs. G-4-146967 | Wildcat | Headington Energy Partners, LLC | 1 | 0 | 0 | Oct 1993 – — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Apr 1993 → Jan 1994
- 2Exxon Mobil CorporationNov 2005 → Nov 2012
- 3Headington Oil Company LLCDec 2012 → Jul 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416264-99 | Recompletion | Exxon Corp. | Sep 21, 1993 | Sep 21, 1993 | Sep 28, 1993 | 6,223 |
| 389666-98 | Recompletion | Exxon Corp. | Sep 13, 1991 | Jul 9, 1991 | — | 7,958 |
| 389666-99 | Recompletion | Exxon Corp. | Jul 8, 1991 | Jul 9, 1991 | — | 7,958 |
| 348031-99 | Recompletion | Exxon Corp. | Jun 21, 1988 | Jun 22, 1988 | — | 7,958 |
| 303164-99 | Recompletion | Exxon Corp. | Jun 11, 1986 | Jun 12, 1986 | — | 7,958 |
| 228051-99 | Recompletion | Exxon Corp. | Jan 26, 1984 | Jan 27, 1984 | — | 7,958 |
| 207706-99 | Recompletion | Exxon Corp. | Aug 18, 1983 | Aug 25, 1983 | — | 7,958 |
| 183073-99 | Recompletion | Exxon Corp. | Jan 12, 1983 | Jan 12, 1983 | — | 7,958 |
| 94903-99 | Other | Exxon Corp. | Oct 6, 1980 | Oct 6, 1980 | — | 7,958 |
| 48098-99 | Other | Exxon Corp. | May 8, 1979 | May 8, 1979 | — | 7,958 |
| 34345-99 | Other | Exxon Corp. | Oct 10, 1978 | Oct 10, 1978 | — | 7,958 |
| 25778-99 | Drill | Exxon Corp. | Jun 2, 1978 | Jun 5, 1978 | Jun 8, 1978 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 24, 1993 | East S. K. Mrs. G-4-148989 | Rita (Consolidated) | Headington Energy Partners LLC | Plugged | — |
| Oct 19, 1993 | East S. K. Mrs. G-4-146967 | Wildcat | Headington Energy Partners LLC | Plugged | — |
| Aug 29, 1991 | East Mrs. S.K. G-4-139427 | Rita (Consolidated) | Headington Energy Partners LLC | Plugged | — |
| Sep 26, 1988 | East S.K. Mrs. G-4-114278 | Rita (7-L II) | Exxon Corp. | Plugged | — |
| Sep 26, 1988 | East S.K. Mrs. G-4-114278 | Rita (7-L II) | Exxon Corp. | Plugged | — |
| Sep 21, 1983 | East S.K. Mrs. G-4-107484 | Rita (7-B II) | Exxon Corp. | Plugged | — |
| Mar 15, 1983 | East S. K. Mrs. O-4-9239 | Rita (9-R-II) | Exxon Corp. | Plugged | — |
| Mar 2, 1983 | Mrs. East S.K. G-4-105553 | Rita (9-a SEG.2) | Exxon Corp. | Plugged | — |
| Oct 22, 1980 | East Mrs. S. K. G-4-91940 | Rita (9-B&C II) | Exxon Corp. | Plugged | — |
| May 23, 1979 | East Mrs. S.K. G-4-83025 | Rita (9-S-II) | Exxon Corp. | Plugged | — |
| Jul 16, 1978 | East Mrs. S. K. G-4-78619 | Rita (10-L-II) | Exxon Corp. | Plugged | — |
| Jul 12, 1978 | East Mrs. S. K. O-4-9152 | Rita (9-S-II) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,740 | 1,744 | Perforated |
| 4,673 | 4,681 | Perforated |
| 5,765 | 5,768 | Perforated |
| 6,168 | 6,173 | Perforated |
| 6,202 | 6,207 | Perforated |
| 6,316 | 6,320 | Perforated |
| 6,710 | 6,720 | Perforated |
| 6,757 | 6,766 | Perforated |
| 6,971 | 7,195 | Perforated |
| 7,230 | 7,256 | Perforated |
| 7,254 | 7,258 | Perforated |
| 7,618 | 7,625 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,548 | 12.25 | 540 S |
| 9.625 | 1,549 | 12.25 | 540 S |
| 2.875 | 7,930 | 7.875 | 1,660 S |
| 2.875 | 7,931 | 7.875 | 1,660 S |
| 2.875 | 7,931 | — | — |
| 2.875 | 7,945 | 7.875 | 1,660 S |
| 2.875 | 7,945 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 4, 1994 | Dec 16, 1993 | Yes |
| 00 | May 5, 1994 | — | — |
| 00 | Dec 3, 1993 | Oct 29, 1993 | Yes |
| 00 | Nov 1, 1993 | — | — |
| 00 | Oct 29, 1991 | Sep 12, 1991 | Yes |
| 00 | Oct 7, 1991 | — | — |
| 00 | Dec 14, 1988 | Nov 10, 1988 | Yes |
| 00 | Feb 4, 1985 | Jan 2, 1985 | — |
| 00 | Jan 15, 1985 | Nov 2, 1984 | — |
| 00 | Jan 12, 1984 | Oct 11, 1983 | — |
| 00 | Jan 12, 1984 | Apr 7, 1983 | — |
| 00 | Jan 12, 1984 | Dec 17, 1980 | — |
| 00 | Jan 12, 1984 | Jul 12, 1979 | — |
| 00 | Jan 12, 1984 | Feb 12, 1979 | — |
| 00 | Jan 12, 1984 | Sep 15, 1978 | — |
| 00 | Jan 12, 1984 | Aug 25, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30429 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30429 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130429, documented in the API reference.