TEXAS · WELLS · KENEDY COUNTY · API 42-261-30477 · DISTRICT 04
East S.K. Mrs. #105
Kenedy County · Rita (5-P II) field · Vertical
East S.K. Mrs. #105 (API 42-261-30477) is a plugged well in Kenedy County, plugged December 27, 2013, last operated by Headington Oil Company LLC.
The RRC has issued 4 drilling permits between 1979 and 1991, permitted to 8,000 ft.
It was permitted by Exxon Corp. and has since transferred to Headington Oil Company LLC on the wellbore schedule.
Its 3 leases have reported 430 barrels of oil and 77.3K mcf of gas since January 1993, last reporting in December 2013. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 29, 2015
- Permits on file
- 45
- Phone
- (214) 696-0606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | Headington Oil Company LLCthrough Aug 2013 |
| Latest permit | Exxon Corp.Mar 21, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 4
- permits on file
- Mar 21, 1991
- last permit issued
- May 18, 2006
- completed
- 430
- cumulative oil, bbl
- 77.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 18, 2006
- Shut in
- —
- Plugged
- Dec 27, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| East, S.K. Mrs. G-4-103568 | Rita (5-P, II) | Headington Oil Company LLC | 1 | 0 | 76.4K | Jan 1993 – Dec 2013 |
| Eask, Mrs. S. K. O-4-11953 | Rita (5-a, Upper) | Exxon Mobil Corporation | 1 | 430 | 889 | Jan 1993 – Nov 2006 |
| — G-4-84228 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Oct 1993
- 2Exxon Mobil CorporationFeb 2006 → Nov 2012
- 3Headington Oil Company LLCDec 2012 → Aug 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 385755-99 | Recompletion | Exxon Corp. | Mar 14, 1991 | Mar 21, 1991 | Apr 17, 1991 | 7,741 |
| 252156-99 | Recompletion | Exxon Corp. | Sep 17, 1984 | Sep 21, 1984 | — | 7,741 |
| 176186-99 | Recompletion | Exxon Corp. | Nov 2, 1982 | Nov 2, 1982 | — | 8,000 |
| 45016-99 | Drill | Exxon Corp. | Mar 26, 1979 | Mar 26, 1979 | Mar 30, 1979 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 18, 2006 | East S.K. Mrs. G-4-103568 | Rita (5-P II) | Headington Oil Company LLC | Plugged | — |
| May 23, 1991 | Eask Mrs. S. K. O-4-11953 | Rita (5-a Upper) | Exxon Mobil Corporation | Plugged | — |
| Oct 29, 1984 | East S.K. Mrs. G-4-84228 | Rita (5-R II) | Exxon Corp. | Plugged | — |
| Oct 29, 1984 | East S.K. Mrs. G-4-84228 | Rita (5-R II) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,690 | 4,694 | Perforated |
| 5,075 | 5,084 | Perforated |
| 5,208 | 5,216 | Perforated |
| 5,262 | 5,267 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,538 | 12.25 | 663 S |
| 2.875 | 7,725 | 7.875 | 1,254 S |
| 2.875 | 7,726 | — | — |
| 2.875 | 7,727 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 2007 | Jul 14, 2006 | — |
| 00 | Oct 4, 1991 | Jul 8, 1991 | Yes |
| 00 | Jul 22, 1991 | — | — |
| 00 | Nov 28, 1984 | Nov 16, 1984 | — |
| 00 | Jan 12, 1984 | Jan 6, 1983 | — |
| 00 | Jan 12, 1984 | Aug 17, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30477 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30477 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130477, documented in the API reference.