TEXAS · WELLS · KENEDY COUNTY · API 42-261-30564 · DISTRICT 04
East S. K. Mrs. #111
Kenedy County · Wildcat field · Vertical
East S. K. Mrs. #111 (API 42-261-30564) is a plugged well in Kenedy County, plugged September 4, 2013, last operated by Headington Oil Company LLC.
The RRC has issued 6 drilling permits between 1980 and 2009, permitted to 10,200 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Headington Oil Company LLC on the wellbore schedule.
Its 4 leases have reported 9.76K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 29, 2015
- Permits on file
- 45
- Phone
- (214) 696-0606
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Headington Oil Company LLC |
| Production reports | Exxon Mobil Corporationthrough Aug 1993 |
| Latest permit | Exxon Mobil CorporationMar 9, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,200
- total depth, ft
- 6
- permits on file
- Mar 9, 2009
- last permit issued
- Feb 17, 2009
- completed
- 0
- cumulative oil, bbl
- 9.76K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 17, 2009
- Shut in
- —
- Plugged
- Sep 4, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| East, S.K. Mrs. G-4-107521 | Rita, N.E. (H-73) | Exxon Mobil Corporation | 1 | 0 | 9.76K | Jan 1993 – Aug 1993 |
| East, Mrs. S.K. G-4-90102 | Rita, NE. (H-75) | Headington Oil Company LLC | 1 | 0 | 0 | Jan 1993 – — |
| East, Mrs. S. K. G-4-185327 | Wildcat | Exxon Mobil Corporation | 1 | 0 | 0 | Sep 2001 – — |
| East, S. K. Mrs. G-4-246995 | Wildcat | Headington Oil Company LLC | 1 | 0 | 0 | Feb 2009 – — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Aug 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 679225-99 | Recompletion | Exxon Mobil Corporation | Mar 6, 2009 | Mar 9, 2009 | — | 8,800 |
| 678050-99 | Recompletion | Exxon Mobil Corporation | Jan 30, 2009 | Feb 4, 2009 | Feb 12, 2009 | 8,800 |
| 511391-99 | Recompletion | Exxon Mobil Corporation | Jul 12, 2001 | Jul 12, 2001 | Aug 13, 2001 | 7,580 |
| 204396-99 | Recompletion | Exxon Corp. | Aug 5, 1983 | Aug 5, 1983 | — | 9,700 |
| 167448-99 | Recompletion | Exxon Corp. | Jul 28, 1982 | Jul 28, 1982 | — | 10,200 |
| 73520-99 | Drill | Exxon Corp. | Feb 26, 1980 | Feb 26, 1980 | — | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 17, 2009 | East S. K. Mrs. G-4-246995 | Wildcat | Headington Oil Company LLC | Plugged | — |
| Sep 7, 2001 | East S.K. Mrs. G-4-107521 | Rita N.E. (H-73) | Exxon Mobil Corporation | Plugged | — |
| Sep 7, 2001 | East Mrs. S. K. G-4-185327 | Wildcat | Exxon Mobil Corporation | Plugged | — |
| Sep 13, 1982 | East Mrs. S.K. G-4-91689 | Rita NE (J-57) | Exxon Corp. | Plugged | — |
| Sep 13, 1982 | East Mrs. S.K. G-4-91689 | Rita NE (J-57) | Exxon Corp. | Plugged | — |
| Apr 28, 1980 | East Mrs. S.K. G-4-90102 | Rita NE. (H-75) | Headington Oil Company LLC | Plugged | — |
| — | East Mrs. S. K. O-4-9311 | Wildcat | Headington Energy Partners LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,746 | 6,758 | Perforated |
| 7,422 | 7,434 | Perforated |
| 7,581 | 7,587 | Perforated |
| 7,667 | 7,684 | Perforated |
| 8,779 | 8,784 | Perforated |
| 9,566 | 9,572 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.875 | 967 | 7.875 | 800 S |
| 8.625 | 1,535 | 12.25 | 625 S |
| 8.625 | 1,536 | 12.25 | 625 sx |
| 2.875 | 9,667 | — | — |
| 2.875 | 9,672 | 7.875 | 800 S |
| 2.875 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 2009 | Feb 27, 2009 | Yes |
| 00 | May 13, 2009 | — | — |
| 00 | Nov 21, 2001 | Oct 5, 2001 | Yes |
| 00 | Nov 8, 2001 | — | — |
| 00 | Oct 24, 2001 | Sep 28, 2001 | — |
| 00 | Sep 25, 1984 | Jul 25, 1984 | — |
| 00 | Jan 12, 1984 | Jul 25, 1984 | — |
| 00 | Jan 12, 1984 | Sep 27, 1983 | — |
| 00 | Jan 12, 1984 | Oct 6, 1980 | Yes |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30564 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30564 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130564, documented in the API reference.