WELL · 42-261-30641 · DISTRICT 4
Sarita Field Oil & Gas Unit #164
Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Shut IN · Vertical
Sarita Field Oil & Gas Unit #164 (API 42-261-30641) is a well in Kenedy County operated by Headington Energy Partners LLC, completed August 30, 1989 and listed as shut in on the RRC schedule, shut in September 1, 2010.
The RRC has issued 3 drilling permits between 1981 and 1989, permitted to 7,225 ft.
It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.
Its 3 leases have reported 188K barrels of oil and 338K mcf of gas since January 1993, last reporting in July 2026. The leases carry 46 wells, so these are lease totals, not this well alone.
Operator of record
Headington Energy Partners LLC
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 26, 2025
- Permits on file
- 175
- Phone
- (361) 885-0110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | Headington Energy Partners, LLCthrough Apr 2026 |
| Latest permit | Exxon Corp.Jul 12, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,225
- total depth, ft
- 3
- permits on file
- Jul 12, 1989
- last permit issued
- Aug 30, 1989
- completed
- 188K
- cumulative oil, bbl
- 338K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 30, 1989
- Shut in
- Sep 1, 2010
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 46 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sarita Field Oil & Gas Unit O-4-13623 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners, LLC | 43 | 158K | 262K | Sep 2010 – Jul 2026 |
| Sarita Field Oil & Gas Unit O-4-11710 | Sarita (6-a, C) | Exxon Mobil Corporation | 1 | 28.1K | 68.3K | Jan 1993 – Oct 2010 |
| Sarita FLD Oil & Gas Unit O-4-10774 | Sarita (7-B) | Exxon Corp. | 2 | 1.03K | 7.58K | Jan 1993 – Aug 1996 |
Oil, barrels lease total
Last 12 months 20,560 · prior 12 4,944(+316%)
Gas, mcf lease total
Last 12 months 47,907 · prior 12 6,927(+592%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Jan 1999
- 2Exxon Mobil CorporationOct 2001 → Aug 2003
- 3Headington Oil Company LLCSep 2014 → Nov 2014
- 4Headington Energy Partners, LLCMar 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 361338-99 | Recompletion | Exxon Corp. | Jul 10, 1989 | Jul 12, 1989 | — | 7,225 |
| 266728-99 | Recompletion | Exxon Corp. | Feb 11, 1985 | Feb 12, 1985 | — | 8,100 |
| 119273-99 | Drill | Exxon Corp. | May 22, 1981 | May 22, 1981 | May 31, 1981 | 7,625 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 30, 1989 | Sarita Field Oil & Gas Unit O-4-13623 | Sarita Shallow (Mio-Frio Cons.) | Headington Energy Partners LLC | Shut IN · shut in Sep 1, 2010 | 7,225 |
| Aug 30, 1989 | Sarita Field Oil & Gas Unit O-4-11710 | Sarita (6-a C) | Exxon Mobil Corporation | Not on Schedule | — |
| Mar 25, 1985 | Sarita FLD Oil & Gas Unit O-4-10774 | Sarita (7-B) | Exxon Corp. | Not on Schedule | — |
| Sep 3, 1981 | Sarita Field Oil & Gas Unit O-4-9938 | Sarita (15-E W) | Exxon Corp. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,080 | 5,088 | Perforated |
| 5,456 | 5,472 | Perforated |
| 7,072 | 7,076 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 318 | 17.5 | 352 S |
| 13.375 | 318 | — | 352 S |
| 8.625 | 2,695 | 12.25 | 1,070 S |
| 8.625 | 2,695 | — | 1,070 S |
| 2.875 | 6,988 | — | — |
| 5.5 | 7,223 | 7.875 | 1,197 S |
| 5.5 | 7,223 | — | 1,197 S |
| 5.5 | 7,224 | — | 1,197 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 2010 | Nov 7, 1989 | Yes |
| 00 | Jan 9, 1990 | Nov 7, 1989 | Yes |
| 00 | Dec 19, 1989 | — | Yes |
| 00 | Jun 10, 1985 | Apr 29, 1985 | — |
| 00 | Jun 7, 1985 | — | — |
| 00 | Jan 12, 1984 | Nov 6, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30641 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30641 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130641, documented in the API reference.