TEXAS · WELLS · KENEDY COUNTY · API 42-261-30662 · DISTRICT 04

Sarita Field Oil & Gas Unit #166

Shut in

Kenedy County · Sarita Shallow (Mio-Frio Cons.) field · Shut In  · Vertical

Sarita Field Oil & Gas Unit #166 (API 42-261-30662) is a well in Kenedy County operated by Headington Energy Partners LLC, completed October 8, 1989 and listed as shut in on the RRC schedule, shut in January 1, 1998.

The RRC has issued 7 drilling permits between 1981 and 1989, permitted to 6,420 ft.

It was permitted by Exxon Corp. and has since transferred to Headington Energy Partners LLC on the wellbore schedule.

Its 2 leases have reported 266K barrels of oil and 380K mcf of gas since January 1993, last reporting in July 2026. The leases carry 49 wells, so these are lease totals, not this well alone.

Operator of record

Headington Energy Partners LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Aug 26, 2025
Permits on file
175
Phone
(361) 885-0110

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHeadington Energy Partners, LLCthrough Apr 2026
Latest permitExxon Corp.Jun 30, 1989
6,420
total depth, ft
7
permits on file
Jun 30, 1989
last permit issued
Oct 8, 1989
completed
266K
cumulative oil, bbl
380K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 8, 1989
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 49 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sarita Field Oil & Gas Unit O-4-13623Sarita Shallow (Mio-Frio Cons.)Headington Energy Partners, LLC43158K262KSep 2010 – Jul 2026
Sarita Field Oil & Gas Unit O-4-11617Sarita ( 5-P)Exxon Mobil Corporation6108K118KJan 1993 – Oct 2010

Oil, barrels lease total

Last 12 months 20,560 · prior 12 4,944(+316%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 47,907 · prior 12 6,927(+592%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Oct 2009
  3. 3Headington Oil Company LLCSep 2014 → Nov 2014
  4. 4Headington Energy Partners, LLCMar 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
360901-99RecompletionExxon Corp.Jun 28, 1989Jun 30, 1989—6,420
346971-99RecompletionExxon Corp.May 25, 1988May 26, 1988—6,420
302460-99RecompletionExxon Corp.May 19, 1986May 23, 1986—6,420
268898-99RecompletionExxon Corp.Mar 4, 1985Mar 11, 1985—6,400
246849-99RecompletionExxon Corp.Jul 30, 1984Jul 31, 1984—6,400
228689-99RecompletionExxon Corp.Feb 7, 1984Feb 8, 1984—6,400
127626-99DrillExxon Corp.Jul 29, 1981Jul 29, 1981Sep 9, 19816,820

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 8, 1989Sarita Field Oil & Gas Unit O-4-13623Sarita Shallow (Mio-Frio Cons.)Headington Energy Partners LLCShut In · shut in Jan 1, 19986,420
Oct 8, 1989Sarita Field Oil & Gas Unit O-4-11617Sarita ( 5-P)Exxon Mobil CorporationPlugged—
May 22, 1985Sarita Field Oil & Gas Unit O-4-9130Sarita (8-D S)Exxon Corp.Plugged—
May 22, 1985Sarita Field Oil & Gas Unit O-4-9130Sarita (8-D S)Exxon Corp.Plugged—
May 22, 1985Sarita Field Oil & Gas Unit O-4-9130Sarita (8-D S)Exxon Corp.Plugged—
May 22, 1985Sarita Field Oil & Gas Unit O-4-9130Sarita (8-D S)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,5962,602Perforated
3,6953,701Perforated
4,8604,880Perforated
5,4545,470Perforated
5,9815,990Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37532817.5355 S
8.6252,73612.251,430 S
8.6252,73712.251,430 S
2.8755,780——
5.56,4147.8751,015 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 2010Nov 1, 1989Yes
00Dec 18, 1989Nov 1, 1989Yes
00Nov 21, 1989——
00Aug 12, 1985Jun 28, 1985—
00Jan 9, 1985Dec 12, 1984—
00Aug 20, 1984Jul 27, 1984—
00Jan 12, 1984Jul 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130662, documented in the API reference.