TEXAS · WELLS · KENEDY COUNTY · API 42-261-30763 · DISTRICT 04
Kleberg R.j.jr.tr.patricio Past. #21
Kenedy County · Pita S.(i-48 N) field · Vertical
Kleberg R.J.JR.TR.Patricio Past. #21 (API 42-261-30763) is a plugged well in Kenedy County, plugged February 3, 1992, last operated by Exxon Corp..
The RRC has issued 3 drilling permits between 1982 and 1991, permitted to 10,900 ft.
Completion filings report one formation top, including See Attached.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Sep 17, 1991 |
- 10,900
- total depth, ft
- 3
- permits on file
- Sep 17, 1991
- last permit issued
- Oct 16, 1990
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 1990
- Shut in
- —
- Plugged
- Feb 3, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
No volumes reported on these leases in the last three years.
Wells named Kleberg R.j.jr.tr.patricio Past.
Exxon Corp.'s other wells filed under this lease name in Kenedy County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsPermits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 391899-99 | Recompletion | Exxon Corp. | Sep 13, 1991 | Sep 17, 1991 | — | 10,202 |
| 361339-99 | Recompletion | Exxon Corp. | Jul 10, 1989 | Jul 12, 1989 | Sep 24, 1990 | 10,202 |
| 171463-99 | Drill | Exxon Corp. | Sep 9, 1982 | Sep 9, 1982 | Sep 30, 1982 | 10,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 16, 1990 | Kleberg R.j.jr.tr.patricio Past. G-4-136258 | Pita S.(i-48 N) | Exxon Corp. | Plugged | — |
| Nov 12, 1982 | Kleberg R.J. Jr.tr.patricio Pas. G-4-103712 | Pita S. (I-35) | Exxon Corp. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 77 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| See Attached | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,353 | 8,361 | Perforated |
| 8,486 | 8,492 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,542 | 12.25 | 695 S |
| 2.875 | 8,004 | — | — |
| 5.5 | 8,797 | 7.875 | 510 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 20, 1991 | Oct 24, 1990 | — |
| 00 | Dec 20, 1990 | — | Yes |
| 00 | Jan 12, 1984 | Dec 29, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30763 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30763 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130763, documented in the API reference.