TEXAS · WELLS · KENEDY COUNTY · API 42-261-30767 · DISTRICT 04

State Tract 389 #1

Plugged

Kenedy County  · Vertical

Permitted field
Wildcat · the district's fallback for a zone no field is named for

State Tract 389 #1 (API 42-261-30767) is a plugged well in Kenedy County, plugged September 14, 1983, last operated by Marathon Oil Company.

The RRC has issued one drilling permit, issued September 10, 1982, permitted to 18,500 ft.

Operator of record

Marathon Oil Company

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2025
Permits on file
3,707
Phone
(281) 293-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMarathon Oil CompanySep 10, 1982
18,500
total depth, ft
1
permits on file
Sep 10, 1982
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 14, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
171611-99DrillMarathon Oil CompanySep 10, 1982Sep 10, 1982Apr 25, 198318,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130767, documented in the API reference.