TEXAS · WELLS · KENEDY COUNTY · API 42-261-30772 · DISTRICT 04
King Ranch San Jose de la Parra #43
Kenedy County · Wildcat field · Vertical
- Fields on the latest permit · any of 3
- Calandria (H - 72) · Calandria (H73) · Calandria (H-79)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
King Ranch San Jose De La Parra #43 (API 42-261-30772) is a plugged well in Kenedy County, plugged November 29, 2007, last operated by Exxon Mobil Corporation.
The RRC has issued 6 drilling permits between 1982 and 1997, permitted to 48,540 ft.
It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.
Its 4 leases have reported 71.4K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Mobil Corporationthrough Oct 1997 |
| Latest permit | Exxon Corp.Jul 23, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 48,540
- total depth, ft
- 6
- permits on file
- Jul 23, 1997
- last permit issued
- Nov 26, 1991
- completed
- 0
- cumulative oil, bbl
- 71.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 26, 1991
- Shut in
- —
- Plugged
- Nov 29, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch San Jose de la Parra G-4-139493 | Calandria (H-90) | Exxon Mobil Corporation | 1 | 0 | 71.4K | Jan 1993 – Oct 1997 |
| — G-4-104937 | — | — | 0 | 0 | 0 | — |
| — G-4-106397 | — | — | 0 | 0 | 0 | — |
| King Ranch San Jose de la Parra G-4-140536 | Wildcat | Exxon Mobil Corporation | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Oct 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 465310-99 | Recompletion | Exxon Corp. | Jul 23, 1997 | Jul 23, 1997 | — | 7,896 |
| 389664-99 | Recompletion | Exxon Corp. | Jul 8, 1991 | Jul 9, 1991 | Jul 26, 1991 | 9,950 |
| 340594-99 | Recompletion | Exxon Corp. | Dec 23, 1987 | Dec 20, 1987 | — | 9,950 |
| 276536-99 | Recompletion | Exxon Corp. | Mar 18, 1985 | Apr 26, 1985 | — | 48,540 |
| 200189-99 | Recompletion | Exxon Corp. | Mar 23, 1984 | Jul 1, 1983 | — | 9,940 |
| 173605-99 | Drill | Exxon Corp. | Oct 5, 1982 | Oct 5, 1982 | Jan 11, 1983 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 26, 1991 | King Ranch San Jose de la Parra G-4-140536 | Wildcat | Exxon Mobil Corporation | Plugged | — |
| Aug 12, 1991 | King Ranch San Jose de la Parra G-4-139493 | Calandria (H-90) | Exxon Mobil Corporation | Plugged | — |
| Sep 29, 1988 | King Ranch San Jose de la Parra G-4-106397 | Calandria (I-75) | Exxon Corp. | Plugged | — |
| Sep 29, 1988 | King Ranch San Jose de la Parra G-4-106397 | Calandria (I-75) | Exxon Corp. | Plugged | — |
| Sep 29, 1988 | King Ranch San Jose de la Parra G-4-106397 | Calandria (I-75) | Exxon Corp. | Plugged | — |
| Feb 27, 1983 | King Ranch San Jose de la Parra G-4-104937 | Calandria (I-60) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,923 | 7,928 | Perforated |
| 8,209 | 8,217 | Perforated |
| 8,440 | 8,462 | Perforated |
| 8,608 | 8,612 | Perforated |
| 8,746 | 8,751 | Perforated |
| 8,830 | 8,838 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,615 | 12.25 | 1,380 S |
| 8.625 | 1,617 | 12.25 | 1,380 S |
| 2.875 | 9,930 | — | — |
| 2.875 | 9,931 | — | — |
| 2.875 | 9,940 | 7.875 | 1,834 S |
| 2.875 | 9,944 | 7.875 | 1,834 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 20, 1992 | Feb 7, 1992 | Yes |
| 00 | Feb 12, 1992 | — | — |
| 00 | Oct 23, 1991 | Aug 22, 1991 | Yes |
| 00 | Oct 11, 1991 | — | — |
| 00 | Jan 10, 1989 | Nov 10, 1988 | Yes |
| 00 | Jun 4, 1986 | May 20, 1986 | — |
| 00 | Mar 22, 1985 | Oct 3, 1984 | — |
| 00 | Jan 12, 1984 | Apr 19, 1983 | — |
| 00 | Jan 12, 1984 | Feb 22, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30772 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30772 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130772, documented in the API reference.