TEXAS · WELLS · KENEDY COUNTY · API 42-261-30785 · DISTRICT 04

King Ranch San Jose de la Parra #50

Plugged

Kenedy County · Calandria (F-06 N) field  · Vertical

King Ranch San Jose De La Parra #50 (API 42-261-30785) is a plugged well in Kenedy County, plugged December 24, 1997, last operated by Exxon Mobil Corporation.

The RRC has issued 5 drilling permits between 1982 and 1991, permitted to 8,270 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Its 5 leases have reported 27 barrels of oil and 8.64K mcf of gas since the record begins in January 1993, with no volume in the three years through August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Jul 1993
Latest permitExxon Corp.Jun 19, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,270
total depth, ft
5
permits on file
Jun 19, 1991
last permit issued
Jul 30, 1991
completed
27
cumulative oil, bbl
8.64K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH JUL 1993

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 30, 1991
Shut in
—
Plugged
Dec 24, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King Ranch San Jose de la Parra G-4-139497Calandria (F-06,N)Exxon Mobil Corporation1278.64Kby Jan 1993 – Jul 1993
— G-4-106068——000—
— G-4-118920——000—
King Ranch San Jose de la Parra G-4-133949Calandria (E-77,N)Exxon Corp.100by Jan 1993 – —
— G-4-138445——000—

No volumes reported on these leases in the last three years.

Wells named King Ranch San Jose de la Parra

Exxon Mobil Corporation's other wells filed under this lease name in Kenedy County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Jul 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
389003-99RecompletionExxon Corp.Jun 17, 1991Jun 19, 1991Jul 9, 19917,870
365922-99RecompletionExxon Corp.Nov 2, 1989Nov 3, 1989Apr 11, 19917,870
276038-99RecompletionExxon Corp.May 23, 1985May 24, 1985—7,870
248463-99RecompletionExxon Corp.Aug 6, 1984Aug 16, 1984—7,870
181007-99DrillExxon Corp.Dec 23, 1982Dec 23, 1982Jan 13, 19838,270

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 30, 1991King Ranch San Jose de la Parra G-4-139497Calandria (F-06 N)Exxon Mobil CorporationPlugged—
Apr 29, 1991King Ranch San Jose de la Parra G-4-138445WildcatExxon Corp.Plugged—
Jan 24, 1990King Ranch San Jose de la Parra G-4-133949Calandria (E-77 N)Exxon Corp.Plugged—
Oct 7, 1985King Ranch San Jose de la Parra G-4-118920Calandria (F-49)Exxon Corp.Plugged—
Jul 26, 1984King Ranch San Jose de la Parra G-4-112280Calandria (F-91)Exxon Corp.Plugged—
Feb 24, 1983King Ranch San Jose de la Parra G-4-106068Calandria (F-30 W)Exxon Corp.Plugged—
Feb 3, 1983King Ranch San Jose de la Parra G-4-104378Calandria (G-15)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,8544,858Perforated
5,1465,152Perforated
5,3265,334Perforated
5,3645,372Perforated
5,5915,594Perforated
6,0236,028Perforated
6,1806,184Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,62412.251,265 S
8.6251,62912.251,265 S
2.8757,863——
2.8757,8677.8751,039 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 23, 1991Aug 20, 1991Yes
00Oct 11, 1991——
00Jul 8, 1991Jun 11, 1991Yes
00Jun 27, 1991——
00May 4, 1990Feb 9, 1990Yes
00May 1, 1990——
00Dec 4, 1985Nov 15, 1985Yes
00Dec 3, 1985——
00Sep 28, 1984Aug 27, 1984—
00Sep 13, 1984Aug 27, 1984—
00Jan 12, 1984Jun 2, 1983Yes
00Jan 12, 1984Feb 23, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26130785, documented in the API reference.