TEXAS · WELLS · KENEDY COUNTY · API 42-261-30793 · DISTRICT 04
King Ranch Badeno #13
Kenedy County · San Jose South (H-30) field · Vertical
King Ranch Badeno #13 (API 42-261-30793) is a plugged well in Kenedy County, plugged February 1, 2001, last operated by Exxon Mobil Corporation.
The RRC has issued 2 drilling permits between 1983 and 1991, permitted to 8,400 ft.
It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Mobil Corporation |
| Production reports | Exxon Corp.through Feb 2000 |
| Latest permit | Exxon Corp.Jun 6, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,400
- total depth, ft
- 2
- permits on file
- Jun 6, 1991
- last permit issued
- Jul 14, 1991
- completed
- 0
- cumulative oil, bbl
- 773K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 14, 1991
- Shut in
- —
- Plugged
- Feb 1, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Badeno G-4-139045 | San Jose, South (H-30) | Exxon Mobil Corporation | 1 | 0 | 773K | Jan 1993 – Jan 2001 |
| — G-4-104985 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Feb 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 388526-99 | Recompletion | Exxon Corp. | May 31, 1991 | Jun 6, 1991 | Jun 27, 1991 | 8,000 |
| 184492-99 | Drill | Exxon Corp. | Jan 27, 1983 | Jan 27, 1983 | Feb 12, 1983 | 8,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 14, 1991 | King Ranch Badeno G-4-139045 | San Jose South (H-30) | Exxon Mobil Corporation | Plugged | — |
| Mar 17, 1983 | King Ranch Badeno G-4-104985 | San Jose South (H-41) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,274 | 7,278 | Perforated |
| 7,392 | 7,400 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,792 | 12.25 | 786 S |
| 2.875 | 7,999 | 7.875 | 440 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 27, 1991 | Aug 19, 1991 | Yes |
| 00 | Aug 28, 1991 | — | — |
| 00 | Jan 12, 1984 | Mar 31, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-261-30793 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-261-30793 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26130793, documented in the API reference.